The Shellsburg Bridge is a historic structure located in Shellsburg, Iowa, United States. It spans Bear Creek for 64 feet (20 m). In April 1915 the Benton County Board of Supervisors contracted with Alfred Vinall to build the new bridge near Shellsburg's downtown area. He used a special design by the Iowa State Highway Commission (ISHC), and completed the project in late 1915 for $6,081.06. The ISHC designed plain bridges for its rural spans, but because this span is in town it features decorative elements: bichrome concrete detailing, molded concrete balustrades, and incised spandrel panels. The bridge was listed on the National Register of Historic Places in 1998.

Excerpt from the Wikipedia article Shellsburg Bridge (License: CC BY-SA 3.0, Authors).

Shellsburg Bridge
Southwest Sells Street,

Geographical coordinates (GPS) Address External links Nearby Places
placeShow on map

Wikipedia: Shellsburg BridgeContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 42.093416666667 ° E -91.869472222222 °
placeShow on map

Address

Shellsburg Bridge

Southwest Sells Street

Iowa, United States
mapOpen on Google Maps

linkWikiData (Q25346093)
linkOpenStreetMap (647482589)

Share experience

Nearby Places

Duane Arnold Energy Center
Duane Arnold Energy Center

The Duane Arnold Energy Center (DAEC) was Iowa's only nuclear power plant. It is located on a 500-acre (200 ha) site on the west bank of the Cedar River, two miles (3.2 km) north-northeast of Palo, Iowa, USA, or eight miles (13 km) northwest of Cedar Rapids. DAEC entered operation in February 1975. On August 10, 2020, the plant cooling towers were damaged during a derecho, and repairs were deemed uneconomical, as the plant had already been scheduled for decommissioning in October 2020.The operator and majority owner is NextEra Energy Resources (70%). The Central Iowa Power Cooperative owns 20% and the Corn Belt Power Cooperative owns 10%. In January 2018, NextEra Energy announced that it was unlikely that DAEC would operate beyond 2025. The plant was given a 20-year license extension to 2034 but considered closing after Alliant Energy, which contracts for 70% of the plant's electricity, announced it would instead be buying electricity from subsidized sources such as wind and natural gas. In July 2018 the expected closure date was amended to October 2020. The unit permanently ceased making power on 10 August 2020, due to storm damage from the August 2020 Midwest derecho. An NRC report of the incident stated that "the vacuum drawn in secondary containment by the standby gas treatment system was slightly below the technical specification (TS) limit", indicating that the secondary containment system might not have been fully effective had it been challenged. Thus the incident was considered by nuclear safety experts to be "a close call".