place

Hidden Agenda (live house)

2009 establishments in Hong Kong2017 disestablishments in Hong KongAccuracy disputes from March 2022Music venues in Hong Kong

Hidden Agenda was a live house located in the industrial area of Kwun Tong, Hong Kong. It opened in January 2009 and has since then relocated twice due to rising rents and the violation of permitted land uses (that excludes the operation of cultural venues in industrial buildings). The live house staged its final show in July 2017 and was officially closed in October 2017.

Excerpt from the Wikipedia article Hidden Agenda (live house) (License: CC BY-SA 3.0, Authors).

Hidden Agenda (live house)
Wai Yip Street, Kowloon Ngau Tau Kok (Kwun Tong District)

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Hidden Agenda (live house)Continue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 22.315819 ° E 114.215833 °
placeShow on map

Address

Red Square

Wai Yip Street 105
Kowloon, Ngau Tau Kok (Kwun Tong District)
Hong Kong, China
mapOpen on Google Maps

Share experience

Nearby Places

Millennium City, Hong Kong
Millennium City, Hong Kong

Millennium City (Chinese: 創紀之城; Jyutping: cong1 gei2 zi1 seng4) is a group of skyscrapers in Kwun Tong, Hong Kong built along the southern side of Kwun Tong Road near Ngau Tau Kok station and developed by Sun Hung Kai Properties.The Millennium City project currently consists of five buildings, numbered 1, 2, 3, 5 and 6. The number 4 is widely regarded as unlucky in many parts of Asia and in both Chinese and Japanese it is a homophone for "death".Millennium City 1 and 2 are connected and share a mall and a lobby on their ground floor. They host the headquarters of Standard Chartered Bank, a data centre and various other offices. Their reflective blue glass walls look strikingly modern against the areas other, old factory buildings. The two buildings are located opposite to Ngau Tau Kok station. Millennium City 3 is a continuation of buildings 1 and 2, but separated from towers 1 and 2 by the Meyer Building. It is also mostly offices and has a similar architectural design to buildings 1 and 2. However, glass walls are used to a lesser extent and more white tiles are incorporated.Millennium City 5 is built near Kwun Tong station. The building is well known because of the shopping mall it holds - apm. The project has a site area of 107,000 square feet (9,900 m2) and contains over 700,000 square feet (65,000 m2) of office space on top of a regional shopping centre of about 600,000 square feet (56,000 m2). The Bank of East Asia bought the majority of office space here as a back-up operation centre.Millennium City 6 and 7 are under planning, and both will be built in the Kwun Tong Industrial Area, farther from Kwun Tong Road.Millennium City 8 is currently under construction. It is on the site of the former KMB Bus Kwun Tong depot. There are two buildings with total floor area of 1.15m sq ft and the shopping mall occupies 12 floors with another 21 floors of offices and 4 floors of underground car parks. The development will be completed in 2022-23.