place

Pelsall

Conservation areas in EnglandUse British English from July 2019Villages in the West Midlands (county)Walsall
Pelsall Village geograph.org.uk 899226
Pelsall Village geograph.org.uk 899226

Pelsall is a large village in the Metropolitan Borough of Walsall, West Midlands, England. Forming part of the borough's border with Staffordshire, Pelsall is located 4 miles north of central Walsall, midway between the towns of Bloxwich and Brownhills and 3.5 miles northwest of Aldridge. The southern edge of Cannock Chase is 5.5 miles to the north. Pelsall is also 7.5 miles southwest of the cathedral city of Lichfield and 8 miles northeast of Wolverhampton.

Excerpt from the Wikipedia article Pelsall (License: CC BY-SA 3.0, Authors, Images).

Pelsall
Hampton Grove,

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: PelsallContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 52.631 ° E -1.972 °
placeShow on map

Address

Hampton Grove 10
WS3 4PE , Heath End
England, United Kingdom
mapOpen on Google Maps

Pelsall Village geograph.org.uk 899226
Pelsall Village geograph.org.uk 899226
Share experience

Nearby Places

Ormiston Shelfield Community Academy

Ormiston Shelfield Community Academy is a secondary school with academy status located in the Metropolitan Borough of Walsall, West Midlands, England. The school is sponsored by Ormiston Academies Trust under the current leadership of Mr. S Turnbull. On 6 September , the previously existing Shelfield Sports and Community College was replaced by a new entity entitled Shelfield Community Academy. This was mostly a legality involving the governance of the institution, and did not disrupt the educational programmes at the school. Ormiston Shelfield Community Academy serves approximately 1320 students attending the school, including 420 sixth formers. The school is renowned for significantly improving its exam results within the last five years. In 2009, it was announced that many parts of the school would be rebuilt in a new state-of-the-art facility. Kier Education were appointed to build the new school. The first phase of the rebuilding project opened on 7 September 2011 to Year 7 students, incorporating English, Maths, Science, PE and Humanities into the new building.In September 2012, the second phase of the rebuilding project was partially completed in time for the start of the new academic year. New facilities were provided along with IT rooms; a new library, sixth form area, administration and catering facilities. The theatre, which had remained inactive since September 2011 due to refurbishment also re-opened at this time. Other areas, including Business Studies, Technology and the Sixth Form centre was transformed in October 2012 when the old buildings were demolished and an external regeneration product was finished in July 2013.