place

110 Plaza

Office buildings completed in 1971Skyscraper office buildings in San Diego
110 Plaza Building
110 Plaza Building

110 Plaza, also known as the Commonwealth Building or the 110 Tower Building, is a 266 feet (81 m) modernist office building in downtown San Diego, Civic / Core Neighborhood. The address of the building is 110 West A Street, San Diego, CA 92101 and is bordered by Front Street, A Street, 1st Avenue, and Ash Street. When the building opened in 1971, it was the first all-glass high rise in San Diego. The 18-story building has a bronze plate-glass exterior and can be identified by the Commonwealth Financial Network sign located on the top of the north and west-facing sides.

Excerpt from the Wikipedia article 110 Plaza (License: CC BY-SA 3.0, Authors, Images).

110 Plaza
Front Street, San Diego

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: 110 PlazaContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 32.719304 ° E -117.16439902 °
placeShow on map

Address

110 Tower Building

Front Street
92101 San Diego (Little Italy)
California, United States
mapOpen on Google Maps

110 Plaza Building
110 Plaza Building
Share experience

Nearby Places

101 Ash Street
101 Ash Street

101 Ash Street is an unoccupied office building in the downtown core of San Diego, California. The steel and concrete structure was built in 1967 on a rectangular 180 ft (55 m) x 70 ft (21 m) footprint. The building is 21 stories with two additional underground levels for a basement-to-roof height of 315 ft (96 m) and a square footage of 447,732 sq ft (41,595.7 m2), including the 240-car garage. The building was occupied by San Diego Gas & Electric (SDGE) from 1968 to 1998, and then by SDGE parent Sempra Energy from 1998 to 2015. In 2016, Mayor Kevin Faulconer announced a $128 million lease-to-own deal under which the city would acquire the building as-is from owner Cisterra Development and at the end of the 20-year lease own the building free-and-clear. After the deal closed in January 2017, asbestos was discovered, complicating needed renovation work and delaying the move of workers into the building. In August 2018, the San Diego City Council approved a Faulconer administration plan to invest an additional $30 million into the site for renovations. Hundreds of city workers were moved into the building in December 2019; however, by January 2020, the mayor announced an evacuation of the building for safety reasons following asbestos violations by county regulators. In September 2020, the city suspended monthly lease payments due to a lawsuit brought by a resident seeking to nullify the original contract and recover taxpayer losses. In July 2022, the City Council approved a settlement with Cisterra Development, agreeing to pay the developer $86 million for the property while receiving back a refund of $7.5 million from the original lease-to-own payments. San Diego City Attorney Mara Elliott, who approved the initial deal, had urged the council to reject the proposal. The city recuperated an additional $9.4 million in March 2023 after suing Jason Hughes, the real estate broker on the original deal. In August 2023, La Jolla developer Reven Capital proposed converting the building into affordable housing as a part of the city's request for proposals on future development for the site and surrounding publicly owned land.