place

Gateway House, Manchester

Buildings and structures in ManchesterModernist architecture in EnglandOffice buildings completed in 1969
Gateway House wavy facade
Gateway House wavy facade

Gateway House in Manchester, England, is a modernist office block above a row of shops designed by Richard Seifert & Partners and completed in 1969. It replaced a row of 19th-century railway warehouses on the approach to Manchester Piccadilly station. The building, which differed from much of Seifert's contemporary work in that it departed from the bare concrete brutalist style which had become his trademark, was nicknamed the "lazy S" and was reputedly designed as a doodle.

Excerpt from the Wikipedia article Gateway House, Manchester (License: CC BY-SA 3.0, Authors, Images).

Gateway House, Manchester
Manchester City Centre

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Gateway House, ManchesterContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 53.4784564 ° E -2.2318447 °
placeShow on map

Address


Manchester, City Centre
England, United Kingdom
mapOpen on Google Maps

Gateway House wavy facade
Gateway House wavy facade
Share experience

Nearby Places

London Road Fire Station, Manchester
London Road Fire Station, Manchester

London Road Fire Station is a former fire station in Manchester, England. It was opened in 1906, on a site bounded by London Road, Whitworth Street, Minshull Street South and Fairfield Street. Designed in the Edwardian Baroque style by Woodhouse, Willoughby and Langham in red brick and terracotta, it cost £142,000 to build and was built by J. Gerrard and Sons of Swinton. It has been a Grade II* listed building since 1974. In addition to a fire station, the building housed a police station, an ambulance station, a bank, a coroner's court, and a gas-meter testing station. The fire station operated for eighty years, housing the firemen, their families, and the horse-drawn appliances that were replaced by motorised vehicles a few years after its opening. It was visited by royalty in 1942, in recognition of the brigade's wartime efforts. After the war it became a training centre and in 1952 became the first centre equipped to record emergency calls. However, the fire station became expensive to maintain and after council reorganisation decline set in. The building was the headquarters of the Manchester Fire Brigade until the brigade was replaced by the Greater Manchester Fire Service in 1974. The fire station closed in 1986, since when it has been largely unused despite several redevelopment proposals. It was placed on English Heritage's Buildings at Risk Register in 2001 and in 2010 Manchester City Council served a compulsory purchase order on the fire station's owner, Britannia Hotels. Britannia announced in 2015 their intention to sell the building after nearly 30 years of dereliction. It was sold to Allied London in 2015 and renovation commenced in 2018 with the building to be redeveloped as a mixed-use comprising leisure and hotel facilities.

Manchester Piccadilly station
Manchester Piccadilly station

Manchester Piccadilly is the principal railway station in Manchester, England. Opened as Store Street in 1842, it was renamed Manchester London Road in 1847 and became Manchester Piccadilly in 1960. Located to the south-east of Manchester city centre, it hosts long-distance intercity and cross-country services to national destinations including London, Birmingham, Nottingham, Glasgow, Edinburgh, Cardiff, Bristol, Exeter, Plymouth, Reading, Southampton and Bournemouth; regional services to destinations in Northern England including Liverpool, Leeds, Sheffield, Newcastle and York; and local commuter services around Greater Manchester. It is one of 19 major stations managed by Network Rail. The station has 14 platforms: 12 terminal and two through platforms (numbers 13 and 14). Piccadilly is also a major interchange with the Metrolink light rail system with two tram platforms in its undercroft. Piccadilly is the busiest station in the Manchester station group with over 30 million passenger entries and exits between April 2019 and March 2020 (the other major stations in Manchester are Oxford Road and Victoria). As of March 2020, it is the third-busiest station in the United Kingdom outside of London (after Birmingham New Street and Glasgow Central), and is also the fourth-busiest interchange station outside London, with over 2 million passengers changing trains annually. The station hosts services from six train operating companies. Between the late 1990s and early 2000s, Piccadilly station was refurbished, taking five years and costing £100 million (in 2002); it was the most expensive improvement on the UK rail network at the time. Further improvements and expansion plans have been proposed. In December 2014, a Transport and Works Act application was submitted for the construction of two through platforms as part of the Manchester Piccadilly and Manchester Oxford Road Capacity Scheme. As of 2023, this application has not been approved by the incumbent government although Network Rail declared the Castlefield corridor through Manchester 'congested' in September 2019.A new Manchester Piccadilly High Speed station is planned to be built on a viaduct parallel to the north side of the existing station. The station will have six platforms (three islands) for both terminating High Speed 2 trains from London and Birmingham as well as Northern Powerhouse Rail trains to Liverpool, Warrington, Huddersfield, Leeds and beyond. The present Piccadilly Metrolink stop is proposed to be relocated from ground-level below the existing station platforms to a new larger four-platform stop located underground below the high speed station. Provision for a second ground-level Metrolink stop at the eastern end of the high speed station to service future Metrolink extensions, to be called Piccadilly Central, also form part of the plans. A hybrid bill was laid in Parliament on 24 January 2022 seeking powers to permit construction of the scheme.