Contournement Nîmes – Montpellier
The Contournement Nîmes – Montpellier (English: "Nîmes – Montpellier Bypass"), also known as the LGV Nîmes–Montpellier (French: LGV for ligne à grande vitesse), is a French high-speed railway line, bypassing the cities of Nîmes and Montpellier in Southern France. It has the distinction of being the first ligne à grande vitesse to be intentionally built for mixed passenger and freight traffic. The programme was developed with the aim of providing the capacity for several new passenger services, including a 30% increase in the frequency of regional trains, as well as additional freight traffic. Additional benefits include a reduction in travel times for both national and international traffic traversing the route. The line is planned for mixed-use traffic by both TGV trains and freight. The Nîmes – Montpellier Bypass provides access onto the Spanish rail network as well as the proposed mixed LGV Montpellier–Perpignan, a new high-speed line between Montpellier and Perpignan. The journey from Montpellier to Paris takes less than three hours on the new line. In June 2012, SNCF Réseau entered a 25-year public-private partnership with the OC’VIA consortium for the financing, designing, building and maintenance of the line. On 10 December 2017, the first commercial freight train used the route. The first passenger services to Montpellier Sud de France station commenced on 7 July 2018; full service to the station began on 15 December 2019 with the opening of Nîmes–Pont du Gard station.
Excerpt from the Wikipedia article Contournement Nîmes – Montpellier (License: CC BY-SA 3.0, Authors, Images).Contournement Nîmes – Montpellier
Nîmes
Geographical coordinates (GPS) Address Nearby Places Show on map
Geographical coordinates (GPS)
| Latitude | Longitude |
|---|---|
| N 43.8131 ° | E 4.50203 ° |
Address
30129 Nîmes
Occitania, France
Open on Google Maps