place

Read School, Drax

1667 establishments in EnglandBoarding schools in North YorkshireCo-educational boarding schoolsEducational institutions established in the 1660sPrivate schools in North Yorkshire
Use British English from February 2023

Read School, Drax is a boarding, day, and independent school, based in the rural village of Drax, near Selby, North Yorkshire, England. Formerly a boys' school, it became co-educational in 1991. As of 2023 it hosts approximately 265 boys and girls between the ages of 4–18, comprising a senior school of approximately 210 and a junior school of around 55 children.

Excerpt from the Wikipedia article Read School, Drax (License: CC BY-SA 3.0, Authors).

Geographical coordinates (GPS)

Latitude Longitude
N 53.732308 ° E -0.975181 °
placeShow on map

Address

Read School

Main Road
YO8 8NL , Drax
England, United Kingdom
mapOpen on Google Maps

Phone number

call+441757618248

Website
readschool.co.uk

linkVisit website

linkWikiData (Q7300393)
linkOpenStreetMap (201039111)

Share experience

Nearby Places

Drax Power Station
Drax Power Station

Drax power station is a large biomass power station in Drax, North Yorkshire, England, capable of co-firing petroleum coke. It has a 2.6 GW capacity for biomass and had a 1.29 GW capacity for coal that was retired in 2021. Its name comes from the nearby village of Drax. It is situated on the River Ouse between Selby and Goole. Its generating capacity of 3,906 megawatts (MW), which includes the shut down coal units, is the highest of any power station in the United Kingdom, providing about 6% of the United Kingdom's electricity supply.Opened in 1974 and extended in the 1980s, the station was initially operated by the Central Electricity Generating Board. Since privatisation in 1990 ownership has changed several times, and it is operated by the Drax Group. Completed in 1986, it was the newest coal-fired power station in England until it closed in 2021. Flue gas desulphurisation equipment was fitted between 1988 and 1995. The high and low pressure turbines were replaced between 2007 and 2012. By 2010, the station was co-firing biomass. In 2012, the company announced plans to convert three generating units to solely biomass, burning 7.5 million tonnes imported from the United States and Canada. This work was completed in 2016 and a fourth unit was converted in 2018. The company planned to convert its remaining two coal units to Combined Cycle Gas Turbine units and 200 MW battery storage. However, those two coal units were shut in 2021 without converting them to biomass.