place

Hart Island (Washington)

Islands of Skagit County, WashingtonPuget Sound geography stubsRiver islands of Washington (state)

Hart Island is a minor island in Washington. It is located near the city of Sedro-Woolley on the Skagit River, and is carved out by the Hart Slough. DeBays Island is adjacent to Hart Island.

Excerpt from the Wikipedia article Hart Island (Washington) (License: CC BY-SA 3.0, Authors).

Hart Island (Washington)
Suenic Street,

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Hart Island (Washington)Continue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 48.485833333333 ° E -122.26 °
placeShow on map

Address

Skagit RC Club

Suenic Street
98384
Washington, United States
mapOpen on Google Maps

Share experience

Nearby Places

I-5 Skagit River bridge collapse
I-5 Skagit River bridge collapse

On May 23, 2013, at approximately 7:00 pm PDT, a span of the bridge carrying Interstate 5 over the Skagit River in the U.S. state of Washington collapsed. Three people in two different vehicles fell into the river below and were rescued by boat, escaping serious injury. The cause of the catastrophic failure was determined to be an oversize load striking several of the bridge's overhead support beams, leading to an immediate collapse of the northernmost span.The through-truss bridge was built in 1955 and connects the Skagit County cities of Mount Vernon and Burlington, providing a vital link between Vancouver, British Columbia and Seattle. It consists of four consecutive spans that are structurally independent. Only the northernmost span collapsed into the river; the adjacent span also sustained impact damage from the same vehicle, but not severe enough to result in a collapse. The overhead support structure was known to have been struck by a truck as recently as October 2012. Not long before the accident, the bridge had been evaluated as safe. Although not structurally deficient, it was considered "functionally obsolete", meaning it did not meet current design standards. The bridge's design was "fracture-critical," meaning that it did not have redundant structural members to protect its structural integrity in the event of a failure of one of the bridge's support members. Within a month of the collapse, two temporary bridges were erected and placed on the failed span's support columns while the permanent bridge was built. In September 2013, the permanent bridges were installed and work began to prevent similar failures of the remaining three spans.