place

Ace Mill, Hollinwood

Buildings and structures in ChaddertonFormer textile mills in the United KingdomTextile mills in the Metropolitan Borough of OldhamTextile mills owned by the Lancashire Cotton Corporation

Ace Mill is a cotton spinning mill in Chadderton in the Metropolitan Borough of Oldham, Greater Manchester. It was built as Gorse No. 2 Mill, in 1914 and cotton was first spun in 1919 by the Ace Mill Ltd, who renamed the mill. It was taken over by the Lancashire Cotton Corporation in the 1930s and passed to Courtaulds in 1964. Production ended in 1967. Although known as Ace Mill, Hollinwood (due to Hollinwood being the closest serving railway station), the mill is located in the Whitegate area of south Chadderton around a mile away from Hollinwood. The five-storey mill has a floor area of 38,500 sq ft (3,580 m2). It is now used as a warehouse. It was powered by a 2500 hp cross compound engine (Mary and Elizabeth) by Urmson and Thompson built in 1920. It had a 26 ft (7.9 m) flywheel with 42 ropes that ran at 64rpm.

Excerpt from the Wikipedia article Ace Mill, Hollinwood (License: CC BY-SA 3.0, Authors).

Ace Mill, Hollinwood
Junction 21 Business Park,

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Ace Mill, HollinwoodContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 53.5312 ° E -2.1565 °
placeShow on map

Address

Junction 21 Business Park
OL9 9RJ , White Gate
England, United Kingdom
mapOpen on Google Maps

Share experience

Nearby Places

Oldham Branch Railway

The Oldham Branch Railway was an early railway of the Manchester and Leeds Railway Company connecting Oldham to Manchester. The Manchester and Leeds Railway (M&LR) opened its Middleton Junction and Oldham Branch on 31 March 1842 from its mainline, the Manchester to Littleborough railway line (which had opened on 4 July 1839), at Middleton Junction (called at the time Oldham Junction) to Oldham Werneth. This was the first railway to reach Oldham, albeit up a severe incline to Werneth on the west side of the town.The branch had two stations, the junction at Middleton and the terminus at Oldham.Connecting the two stations the branch was 2 miles (3.2 km) long most of which was the Werneth Incline at 1 mile 1,383 yards (2.874 km) long it was one of the steepest passenger worked railway line in Britain, with a gradient of 1:27 for about one mile (1.6 km).The earliest trains to use this line required cable assistance to get to the top of the incline. The method of working was devised by Captain Laws, the company General Manager; it used a balancing load of mineral wagons and a brake van on a reserved track, with a cable passing round a large drum at the head of the incline. Traffic proceeding up the incline would be attached to the rope and drawn up under control by its own locomotive using the descending load to reduce the effort required. The next descending train would be used to draw the balancing load back up the incline. There were sufficient descending trains, both regular service trains and coal trains from Stockfield Colliery to ensure the service ran without much interruption. This arrangement continued until some time between 1851 and 1856, after which ordinary locomotive working was used.The branch carried heavy traffic in its first few years, an average of 750,000 passengers per year, and plans were quickly made for the branch to be extended through the higher ground into Oldham town centre and beyond.A 1 mile (1.6 km) extension was built by the construction of two tunnels with a cutting between them to the only intermediate station at Oldham Central located just beyond the second tunnel and then to Oldham Mumps. The line and stations opened on 1 November 1847.On 12 August 1914 a goods and coal depot was opened at Chadderton. This was at the end of the 1,097 yards (1,003 m) long Chadderton Branch off the Middleton Junction and Oldham Branch approximately 400 yards (370 m) from Middleton Junction.The line from Chadderton Junction to Oldham was closed to regular passengers in 1958 although some diverted services used it in 1960 and completely on 7 January 1963.Middleton Junction closed to passengers on 3 January 1966.The Chadderton goods and coal depot remained open and in use until 1988 (the track was eventually lifted in September 1991).