The Windy Point/Windy Flats project, located in Goldendale, Washington, is the largest wind farm in Washington State. The 90 square miles (230 km2) wind farm spans 26 miles (42 km) along the Columbia River ridgeline and has a capacity of 500 megawatts (MW). Construction of 400 of the 500 MW was completed by the end of 2009. Cannon Power Group, the project developer, constructed the 400 MW in two phases within 18 months—Phase I (137 MW) and Phase II (262 MW).