place

London Aquatics Centre

2011 establishments in England2012 Summer Paralympic venues2012 Summer ParalympicsNeo-futurism architectureOlympic diving venues
Olympic modern pentathlon venuesOlympic swimming venuesOlympic synchronized swimming venuesOve Arup buildings and structuresQueen Elizabeth Olympic ParkSports venues completed in 2011Stratford, LondonSwimming venues in LondonUse British English from June 2012Venues of the 2012 Summer OlympicsZaha Hadid buildings
London, England (15513446165)
London, England (15513446165)

The London Aquatics Centre is an indoor facility with two 50-metre (164-foot) swimming pools and a 25-metre (82-foot) diving pool in Queen Elizabeth Olympic Park in Stratford, London. The centre, designed by architect Zaha Hadid as one of the main venues of the 2012 Summer Olympics and the 2012 Summer Paralympics, was used for the swimming, diving and synchronised swimming events. After significant modification, the centre opened to the public in March 2014.

Excerpt from the Wikipedia article London Aquatics Centre (License: CC BY-SA 3.0, Authors, Images).

Geographical coordinates (GPS)

Latitude Longitude
N 51.5402 ° E -0.0106 °
placeShow on map

Address

London Aquatics Centre


E20 2AQ London (London Borough of Newham)
England, United Kingdom
mapOpen on Google Maps

linkWikiData (Q308874)
linkOpenStreetMap (1169737833)

London, England (15513446165)
London, England (15513446165)
Share experience

Nearby Places

Swimming at the 2012 Summer Olympics

The swimming competitions at the 2012 Summer Olympics in London took place from 28 July to 4 August at the Aquatics Centre. The open-water competition took place from 9 to 10 August in Hyde Park.Swimming featured 34 events (17 male, 17 female), including two 10 km open-water marathons in Hyde Park's Serpentine Lake. The remaining 32 were contested in a 50 m long course pool within the Olympic Park. The United States claimed a total of 31 medals (16 golds, 9 silver, and 6 bronze) in the leaderboard to maintain its supremacy as the most successful nation in swimming. Brought by an unprecedented sporting domination, Michael Phelps emerged as the most decorated Olympian of all time after winning six more medals at these Games to bring his total after the 2012 games to 22 (18 golds, 2 silver, and 2 bronze). Battling against the Americans for an overall medal count, China mounted to an unexpected second-place effort on the leaderboard with a tally of 10 medals (five golds, three silver, and bronze) after striking a superb double from Sun Yang in long-distance freestyle (both 400 and 1500 m) and Ye Shiwen in the individual medley (both 200 and 400 m). Meanwhile, France ended on a spectacular fashion in third spot with a total of seven medals (four golds, two silver, and one bronze), followed by the Netherlands with four, including two golds from Ranomi Kromowidjojo in sprint freestyle (both 50 and 100 m), and South Africa with three.For the first time since 1992, Australia delivered an underwhelming performance with only a single triumph in the freestyle relay, but managed to bring home a total of ten medals. After not winning a gold in swimming since 2000, Japan produced the most medals in the post-war era to build a tally of eleven (three silver and eight bronze).A total of nine world records and twenty five Olympic records were set during the competition.

ArcelorMittal Orbit
ArcelorMittal Orbit

The ArcelorMittal Orbit (often referred to as the Orbit Tower or its original name, Orbit) is a 114.5-metre (376-foot) sculpture and observation tower in the Queen Elizabeth Olympic Park in Stratford, London. It is Britain's largest piece of public art, and is intended to be a permanent lasting legacy of London's hosting of the 2012 Summer Olympic and Paralympic Games, assisting in the post-Olympics regeneration of the Stratford area. Sited between the Olympic Stadium (now called London Stadium) and the Aquatics Centre, it allows visitors to view the whole Olympic Park from two observation platforms. Orbit was designed by Turner-Prize winning artist Anish Kapoor and Cecil Balmond of Arup Group, an engineering firm. Announced on 31 March 2010, it was expected to be completed by December 2011. The project came about after Mayor of London Boris Johnson and Olympics Minister Tessa Jowell decided in 2008 that the Olympic Park needed "something extra". Designers were asked for ideas for an "Olympic tower" at least 100 metres (330 ft) high: Orbit was the unanimous choice from proposals considered by a nine-person advisory panel. Kapoor and Balmond believed that Orbit represented a radical advance in the architectural field of combining sculpture and structural engineering, and that it combined both stability and instability in a work that visitors can engage with and experience via an incorporated spiral walkway. It has been both praised and criticised for its bold design, and has especially received criticism as a vanity project of questionable lasting use or merit as a public art project. The project was expected to cost £19.1 million, with £16 million coming from Britain's then-richest man, the steel tycoon Lakshmi Mittal, Chairman of the ArcelorMittal steel company, and the balance of £3.1 million coming from the London Development Agency. The name "ArcelorMittal Orbit" combines the name of Mittal's company, as chief sponsor, with Orbit, the original working title for Kapoor and Balmond's design. The ArcelorMittal Orbit temporarily closed after the 2012 Olympic and Paralympic Games while the South Plaza (in which Orbit is positioned) underwent reconstruction for its long-term legacy use as a public outdoor space. It re-opened to the public on 5 April 2014. The structure incorporates the world's tallest and longest – 178 m (584 ft) – tunnel slide, designed by Carsten Höller. The idea was originally envisioned by the London Legacy Development Corporation as a way to attract more visitors to the tower. The slide includes transparent sections to give a "different perspective" of the twisting red tower and was completed in June 2016. This follows an option to abseil down the tower, introduced in 2014.

Bow Back Rivers
Bow Back Rivers

Bow Back Rivers or Stratford Back Rivers is a complex of waterways between Bow and Stratford in east London, England, which connect the River Lea to the River Thames. Starting in the twelfth century, works were carried out to drain Stratford Marshes and several of the waterways were constructed to power watermills. Bow Creek provided the final outfall to the Thames, and the other channels were called Abbey Creek, Channelsea River, City Mill River, Prescott Channel, Pudding Mill River, Saint Thomas Creek, Three Mills Back River, Three Mills Wall River and Waterworks River. The rivers have been subject to change over centuries, with Alfred the Great diverting the river in 896 to create a second channel, and Queen Matilda bridging both channels around 1110 by paying for the construction of Bow Bridge. Because the river system was tidal as far as Hackney Wick, several of the mills were tide mills, including those at Abbey Mills and those at Three Mills, one of which survives. Construction of the New River in the seventeenth century to supply drinking water to London, with subsequent extraction by waterworks companies, led to a lowering of water levels, and the river was gradually canalised to maintain navigation. Significant changes occurred with the creation of the Lee Navigation in 1767, which resulted in the construction of the Hackney Cut and the Limehouse Cut, allowing barges to bypass most of the back rivers. A major reconstruction of the rivers took place in the 1930s, authorised by the River Lee (Flood Relief) Act, but by the 1960s, commercial usage of the waterways had largely ceased. Deteriorating infrastructure led to the rivers dwindling to little more than tidal creeks, and they were categorised in 1968 as having no economic or long-term future. However, British Waterways decided that their full restoration was an important aim in 2002, and the construction of the main stadium for the 2012 Summer Olympics on an island formed by the rivers provided funding to construct a new lock and sluices which stabilised water levels throughout the Olympic site. It was hoped that significant amounts of materials for the construction of the Olympic facilities would be delivered by barge, but this did not happen. Improvements to the channels which form a central feature of the Olympic Park included the largest aquatic planting scheme ever carried out in Britain.