place

Sadler's Wells East Theatre

Ballet venues in the United KingdomContemporary danceDance in LondonDance venues in EnglandTheatre stubs
Theatres in the London Borough of Newham
Sadler's Wells East
Sadler's Wells East

Sadler's Wells East Theatre will be a London performing arts venue, located in Queen Elizabeth Olympic Park, a sister venue to the Sadler's Wells Theatre, and will also focus on dance. In June 2018 Sadiq Khan, the mayor of London, announced an additional venue as part of the East Bank project in the Queen Elizabeth Olympic Park Stratford, London. It is set to open on 6 February 2025 with the first production being ‘Our Mighty Groove’ by choreographer Vicki Igbokwe-Ozoagu.

Excerpt from the Wikipedia article Sadler's Wells East Theatre (License: CC BY-SA 3.0, Authors, Images).

Sadler's Wells East Theatre
Carpenters Road, London Stratford (London Borough of Newham)

Geographical coordinates (GPS) Address External links Nearby Places
placeShow on map

Wikipedia: Sadler's Wells East TheatreContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 51.5409354 ° E -0.0118448 °
placeShow on map

Address

Sadler's Wells East

Carpenters Road 101
E20 2AR London, Stratford (London Borough of Newham)
England, United Kingdom
mapOpen on Google Maps

linkWikiData ()
linkOpenStreetMap (1042201704)

Sadler's Wells East
Sadler's Wells East
Share experience

Nearby Places

Swimming at the 2012 Summer Olympics

The swimming competitions at the 2012 Summer Olympics in London took place from 28 July to 4 August at the Aquatics Centre. The open-water competition took place from 9 to 10 August in Hyde Park.Swimming featured 34 events (17 male, 17 female), including two 10 km open-water marathons in Hyde Park's Serpentine Lake. The remaining 32 were contested in a 50 m long course pool within the Olympic Park. The United States claimed a total of 31 medals (16 golds, 9 silver, and 6 bronze) in the leaderboard to maintain its supremacy as the most successful nation in swimming. Brought by an unprecedented sporting domination, Michael Phelps emerged as the most decorated Olympian of all time after winning six more medals at these Games to bring his total after the 2012 games to 22 (18 golds, 2 silver, and 2 bronze). Battling against the Americans for an overall medal count, China mounted to an unexpected second-place effort on the leaderboard with a tally of 10 medals (five golds, three silver, and bronze) after striking a superb double from Sun Yang in long-distance freestyle (both 400 and 1500 m) and Ye Shiwen in the individual medley (both 200 and 400 m). Meanwhile, France ended on a spectacular fashion in third spot with a total of seven medals (four golds, two silver, and one bronze), followed by the Netherlands with four, including two golds from Ranomi Kromowidjojo in sprint freestyle (both 50 and 100 m), and South Africa with three.For the first time since 1992, Australia delivered an underwhelming performance with only a single triumph in the freestyle relay, but managed to bring home a total of ten medals. After not winning a gold in swimming since 2000, Japan produced the most medals in the post-war era to build a tally of eleven (three silver and eight bronze).A total of nine world records and twenty five Olympic records were set during the competition.

ArcelorMittal Orbit
ArcelorMittal Orbit

The ArcelorMittal Orbit (often referred to as the Orbit Tower or its original name, Orbit) is a 114.5-metre (376-foot) sculpture and observation tower in the Queen Elizabeth Olympic Park in Stratford, London. It is Britain's largest piece of public art, and is intended to be a permanent lasting legacy of London's hosting of the 2012 Summer Olympic and Paralympic Games, assisting in the post-Olympics regeneration of the Stratford area. Sited between the Olympic Stadium (now called London Stadium) and the Aquatics Centre, it allows visitors to view the whole Olympic Park from two observation platforms. Orbit was designed by Turner-Prize winning artist Anish Kapoor and Cecil Balmond of Arup Group, an engineering firm. Announced on 31 March 2010, it was expected to be completed by December 2011. The project came about after Mayor of London Boris Johnson and Olympics Minister Tessa Jowell decided in 2008 that the Olympic Park needed "something extra". Designers were asked for ideas for an "Olympic tower" at least 100 metres (330 ft) high: Orbit was the unanimous choice from proposals considered by a nine-person advisory panel. Kapoor and Balmond believed that Orbit represented a radical advance in the architectural field of combining sculpture and structural engineering, and that it combined both stability and instability in a work that visitors can engage with and experience via an incorporated spiral walkway. It has been both praised and criticised for its bold design, and has especially received criticism as a vanity project of questionable lasting use or merit as a public art project. The project was expected to cost £19.1 million, with £16 million coming from Britain's then-richest man, the steel tycoon Lakshmi Mittal, Chairman of the ArcelorMittal steel company, and the balance of £3.1 million coming from the London Development Agency. The name "ArcelorMittal Orbit" combines the name of Mittal's company, as chief sponsor, with Orbit, the original working title for Kapoor and Balmond's design. The ArcelorMittal Orbit temporarily closed after the 2012 Olympic and Paralympic Games while the South Plaza (in which Orbit is positioned) underwent reconstruction for its long-term legacy use as a public outdoor space. It re-opened to the public on 5 April 2014. The structure incorporates the world's tallest and longest – 178 m (584 ft) – tunnel slide, designed by Carsten Höller. The idea was originally envisioned by the London Legacy Development Corporation as a way to attract more visitors to the tower. The slide includes transparent sections to give a "different perspective" of the twisting red tower and was completed in June 2016. This follows an option to abseil down the tower, introduced in 2014.