place

Wentzville Ice Arena

1998 establishments in MissouriBuildings and structures in St. Charles County, MissouriCollege ice hockey venues in the United StatesIndoor arenas in MissouriIndoor ice hockey venues in the United States
Lindenwood Lions ice hockeySports venues completed in 1998
LUIceArenacenterice
LUIceArenacenterice

Wentzville Ice Arena is an arena and recreational sport facility located in Wentzville, Missouri and owned and operated by the City of Wentzville Parks & Recreation Department. It served as the home for LU Lindenwood Lions Men's and Women's ice hockey teams and LU synchronized skating team until relocating to the newly built Centene Community Ice Center. It features two NHL-size sheets of ice for ice hockey, figure skating and open skating, and local high school hockey. Other features of the arena include eight locker rooms, heated bleacher seating, and concession stand. Current capacity for spectators is about 750 for each of the two NHL-size hockey rinks.

Excerpt from the Wikipedia article Wentzville Ice Arena (License: CC BY-SA 3.0, Authors, Images).

Wentzville Ice Arena
Main Plaza Drive,

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Wentzville Ice ArenaContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 38.820309 ° E -90.851623 °
placeShow on map

Address

Main Plaza Drive 910
63385
Missouri, United States
mapOpen on Google Maps

LUIceArenacenterice
LUIceArenacenterice
Share experience

Nearby Places

David K. Bernard Library

The David K. Bernard Library is an academic library that supports the faculty, staff, and students of Urshan Graduate School of Theology and Urshan University. It is named after the General Superintendent of the UPCI and first president of Urshan, Dr. David K. Bernard. Collection development began with the acquisition of the personal library of Ernest E. Jolley, a United Pentecostal Church International minister. Rev Jolley's library was donated to Gateway College of Evangelism and consisted of almost ten thousand volumes. This donation was cataloged and shelved in one of the large classrooms. A major shift in the library took place in 2001 when the Urshan Graduate School of Theology began operation. Intentional acquisition of material relevant to the curriculum and research of the school's professional staff became a top priority. Over 5,000 square feet (460 m2) of floor space was remodeled and designed for library use. The library now consists of approximately 40,000 holdings with 30,000 titles. Future development will broaden to other formats but printed manuscript is the preferred medium for present development. Major renovations and expansion are scheduled as the collection grows to 60,000 holdings. The library was reviewed by the Association of Theological Schools (ATS) in 2008 for accreditation. The David K. Bernard Library maintains membership in the American Theological Library Association (ATLA), and the St. Louis Regional Library Network (SLRLN). It also has access to online digital resources through EBSCOhost and MOREnet.

Wentzville Assembly

Wentzville Assembly is a General Motors automobile assembly facility in Wentzville, Missouri, opened in 1983. Located at 1500 East Route A in Wentzville, the 3.7 million square foot plant sits on 569 acres approximately 40 miles west of St. Louis, just off of I-70. With a similar floor plan to its contemporaries, Michigan's Orion Assembly and Detroit/Hamtramck Assembly plants, the facility includes vehicle assembly as well as body stamping facilities. Originally manufacturing full-size Buick, Oldsmobile and Pontiac sedans, the plant assumed operations of the previous St. Louis Truck Assembly which had been in operation since 1920. In 1996, production shifted from manufacturing unibody, front-drive passenger cars to rear-drive, body on frame trucks, GM's full-size Chevrolet Express and GMC Savana cargo vans on the GMT600 platform, previously manufactured at Lordstown Assembly (Ohio) and Flint Assembly (Michigan). The changeover involved completely gutting and revamping the plant to provide robotic body assembly. The GMT600 vans received a significant revision for the 2003 model year, known internally as the GMT610, which included a new front end, new powertrains ("LS" engines), left hand side cargo doors, and AWD models. In 2014, GM replaced the lighter 1500-series vans with the Chevrolet City Express built by Nissan in Mexico, retaining manufacture of the commercial-grade models in Wentzville. Also in 2014, Wentzville began manufacturing the Chevrolet Colorado and GMC Canyon, whose predecessors had been manuactured at the shuttered Shreveport Assembly factory in Louisiana. Wentzville has received numerous quality awards over the years for both the mid size truck and full size van models.