place

Readsboro, Vermont

Readsboro, VermontTowns in Bennington County, VermontTowns in VermontUse mdy dates from July 2023
Readsboro, Vermont (10845426795)
Readsboro, Vermont (10845426795)

Readsboro is a town in Bennington County, Vermont, United States. The town was named after John Reade, a landholder. The population was 702 at the 2020 census. The hamlet of Heartwellville is in the northern part of Readsboro, approximately 5 miles (8 km) north on Route 100 from the hamlet of Readsboro.The Readsboro census-designated place consists of the town center and had a population of 297 at the 2020 census.

Excerpt from the Wikipedia article Readsboro, Vermont (License: CC BY-SA 3.0, Authors, Images).

Readsboro, Vermont
Main Street,

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Readsboro, VermontContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 42.772222222222 ° E -72.947222222222 °
placeShow on map

Address

Main Street 7073
05350
Vermont, United States
mapOpen on Google Maps

Readsboro, Vermont (10845426795)
Readsboro, Vermont (10845426795)
Share experience

Nearby Places

Bear Swamp Hydroelectric Power Station

Bear Swamp Generating Station or Jack Cockwell Station is a pumped-storage hydroelectric underground power station that straddles the Deerfield River in Rowe and Florida, Massachusetts. The reservoir covers 88 acres (36 ha), storing about 1.7 billion gallons at an elevation of 1,600 feet (490 m) above sea level, 770 feet (230 m) higher than the lower reservoir. To move the huge volumes of water (8,800 cubic feet per second uphill and 10,760 cf/s downhill) in both directions, Bear Swamp uses reversible water turbines of the Francis type. Construction started in 1968 and was completed in 1974. New England Power Company developed Bear Swamp with the intention of absorbing and storing some of the excess electrical power from the Yankee Rowe Nuclear Power Station which was located nearby (almost adjacent) on the Deerfield River, and was then in operation at the time Bear Swamp was constructed. Yankee Rowe was later decommissioned in 1991, however Bear Swamp continues operate by absorbing electrical power from the grid and later returning electrical power to the grid. Although the efficiency of that is very low, the power is stored when demand is off peak, when supply is in excess and demand is low resulting in that power being low priced. Because of the low efficiency, only a small fraction of that power is later returned to the grid, but at a much higher price during peak load periods when New England's electricity consumers place the heaviest demand on the system. The station can produce about 600 megawatts (800,000 hp) of power for up to 6 hours during the day. The station can respond from zero to full capacity in under 20 minutes. An underground visitor' center provides an automated slide show and other information about the history of the project and its site. More than 60,000 guests visit this location each year.