place

West Bay station

Doha Metro stationsRailway stations in Qatar opened in 2019
West Bay station
West Bay station

West Bay Qatar Energy station is a station on Doha Metro's Red Line and serves West Bay district in the Qatari capital Doha. The naming rights to the station are currently held by QatarEnergy.

Excerpt from the Wikipedia article West Bay station (License: CC BY-SA 3.0, Authors, Images).

West Bay station
Qatar General Petroleum Corporation Street, Doha West Bay

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: West Bay stationContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 25.315 ° E 51.5199 °
placeShow on map

Address

الخليج الغربي

Qatar General Petroleum Corporation Street
Doha, West Bay
Qatar
mapOpen on Google Maps

West Bay station
West Bay station
Share experience

Nearby Places

Dubai Towers Doha
Dubai Towers Doha

Dubai Towers - Doha is a super-tall skyscraper with a roof height of 400 m (1,300 ft) (spire height 437 m (1,434 ft)) developing in Doha, Qatar. The estimated cost of Dubai Towers - Doha is 2.3 billion Qatari Riyal (US$620 million). When completed, the structure will be the tallest building in Qatar. Located in the West Bay district of Doha, next to the Doha Corniche, the 90-story multi-use tower is being developed by Sama Dubai, formerly known as Dubai International Properties, the international real estate investment and development arm of Dubai Holding. The project has been contracted to a joint venture between Al-Habtoor and Al Jaber, while Robert Matthew Johnson Marshall (RMJM) are the architects and engineering consultants. The cost consultants are Hanscomb Consultants Inc. The Project Management consultant is Sama ECH. When completed the mixed use tower will include a 7,000 m2 (75,000 sq ft) retail area, 13 floors comprising a 225-room five-star hotel, 29 floors of office space and 31 floors containing 226 luxury apartments and three super luxury penthouses. The project is now severely delayed as a result of the financial crash in Dubai. Investors in the property have been advised that the building is 9 months behind schedule. By May 2010 only 29 of the proposed 84 stories had been built. At that building rate, this would suggest at least another 11-year delay until completion. In February 2022, a few floors have been cladded in dirty glass.