place

Qatar Petroleum District

Hotels in QatarOffice buildings completed in 2016Portal templates with redlinked portalsQatari building and structure stubsSkyscraper office buildings
Skyscrapers in Doha
Doha Skyline 24
Doha Skyline 24

Qatar Petroleum District is a set of ten towers office buildings on the Majlis Al Taawon street, West Bay Doha, Qatar. It is the headquarters for QatarEnergy. The tallest building called Tower 7 is 222.07 metres (728.6 ft) high and has 47 floors. It was begun in 2012 and completed in 2016. The design, construction and comments of this collection have been under the supervision of AECOM. Qatar Petroleum District towers a five-star business hotel, restaurants, conference centre, mosque and other amenities.

Excerpt from the Wikipedia article Qatar Petroleum District (License: CC BY-SA 3.0, Authors, Images).

Qatar Petroleum District
Al Bidda Street, Doha Onaiza

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Qatar Petroleum DistrictContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 25.3167 ° E 51.51897 °
placeShow on map

Address

Graze

Al Bidda Street
Doha, Onaiza
Qatar
mapOpen on Google Maps

Doha Skyline 24
Doha Skyline 24
Share experience

Nearby Places

Dubai Towers Doha
Dubai Towers Doha

Dubai Towers - Doha is a super-tall skyscraper with a roof height of 400 m (1,300 ft) (spire height 437 m (1,434 ft)) developing in Doha, Qatar. The estimated cost of Dubai Towers - Doha is 2.3 billion Qatari Riyal (US$620 million). When completed, the structure will be the tallest building in Qatar. Located in the West Bay district of Doha, next to the Doha Corniche, the 90-story multi-use tower is being developed by Sama Dubai, formerly known as Dubai International Properties, the international real estate investment and development arm of Dubai Holding. The project has been contracted to a joint venture between Al-Habtoor and Al Jaber, while Robert Matthew Johnson Marshall (RMJM) are the architects and engineering consultants. The cost consultants are Hanscomb Consultants Inc. The Project Management consultant is Sama ECH. When completed the mixed use tower will include a 7,000 m2 (75,000 sq ft) retail area, 13 floors comprising a 225-room five-star hotel, 29 floors of office space and 31 floors containing 226 luxury apartments and three super luxury penthouses. The project is now severely delayed as a result of the financial crash in Dubai. Investors in the property have been advised that the building is 9 months behind schedule. By May 2010 only 29 of the proposed 84 stories had been built. At that building rate, this would suggest at least another 11-year delay until completion. In February 2022, a few floors have been cladded in dirty glass.