place

Rankine Generating Station

1905 establishments in Ontario2006 disestablishments in OntarioBridges in Niagara Falls, OntarioBuildings and structures in Niagara Falls, OntarioFormer hydroelectric power stations
Former power stations in CanadaHydroelectric power stations in OntarioNiagara Parks Commission
Rankine generating station National Map NAIP
Rankine generating station National Map NAIP

The Rankine Generating Station is a former hydro-electric generating station along the Canadian side of the Niagara River in Niagara Falls, Ontario, slightly downstream from the older Toronto Power Generating Station. It was built in for the Canadian Niagara Power Company and named for company's founder William Birch Rankine (b. 1858), a New York City (and later of Niagara Falls) lawyer originally from Geneva, New York who died three days after (in Grafton, New Hampshire) the station opened in 1905 and renamed in 1927. Acquired by Niagara Mohawk Power Corporation in 1950 and in 2002, the station became a wholly owned subsidiary of FortisOntario (and part of Canadian owned Fortis Inc.). It was decommissioned in 2006. It reopened in July 2021 as a tourist site.

Excerpt from the Wikipedia article Rankine Generating Station (License: CC BY-SA 3.0, Authors, Images).

Rankine Generating Station
Niagara Parkway, Niagara Falls

Geographical coordinates (GPS) Address Phone number Website External links Nearby Places
placeShow on map

Wikipedia: Rankine Generating StationContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 43.0745 ° E -79.0787 °
placeShow on map

Address

Niagara Parks Power Station (Canadian Niagara Power Company Generating Station)

Niagara Parkway 7005
L2E 6T2 Niagara Falls
Ontario, Canada
mapOpen on Google Maps

Phone number
Niagara Parks Commission

call+18776427275

Website
niagaraparks.com

linkVisit website

linkWikiData (Q7293280)
linkOpenStreetMap (178404800)

Rankine generating station National Map NAIP
Rankine generating station National Map NAIP
Share experience

Nearby Places

Niagara River
Niagara River

The Niagara River () is a river that flows north from Lake Erie to Lake Ontario. It forms part of the border between the province of Ontario in Canada (on the west) and the state of New York in the United States (on the east). There are differing theories as to the origin of the river's name. According to Iroquoian scholar Bruce Trigger, Niagara is derived from the name given to a branch of the locally residing native Neutral Confederacy, who are described as being called the Niagagarega people on several late-17th-century French maps of the area. According to George R. Stewart, it comes from the name of an Iroquois town called Ongniaahra, meaning "point of land cut in two".The river, which is occasionally described as a strait, is about 58 kilometres (36 mi) long and includes Niagara Falls in its course. The falls have moved approximately 11 kilometres (6.8 mi) upstream from the Niagara Escarpment in the last 12,000 years, resulting in a gorge below the falls. Today, the diversion of the river for electrical generation has significantly reduced the rate of erosion. The total drop in elevation along the river is 99 metres (325 ft). The Niagara Gorge extends downstream from the Falls and includes the Niagara Whirlpool and another section of rapids. Power plants on the river include the Sir Adam Beck Hydroelectric Power Stations (built in 1922 and 1954) on the Canadian side, and the Robert Moses Niagara Power Plant (built in 1961) on the American side. Together, they generate 4.4 gigawatts of electricity. The International Control Works, built in 1954, regulates the river flow. Ships on the Great Lakes use the Welland Canal, part of the Saint Lawrence Seaway, on the Canadian side of the river, to bypass Niagara Falls. The Niagara River also features two large islands and numerous smaller islands. Grand Island and Navy Island, the two largest islands, are on the American and Canadian sides of the river, respectively. Goat Island and the tiny Luna Island split Niagara Falls into its three sections, the Horseshoe Falls, Bridal Veil Falls, and American Falls. Unity Island lies further upstream, alongside the city of Buffalo. The Niagara River and its tributaries, Tonawanda Creek and the Welland River, formed part of the last section of the Erie Canal and Welland Canal. After leaving Lockport, New York, the Erie Canal proceeds southwest until it enters Tonawanda Creek. After entering the Niagara River, watercraft then proceed southward to the final lock, where a short section of the canal allows boats to avoid the turbulent shoal water at the river intake and enter Lake Erie. The Welland Canals used the Welland River as a connection to the Niagara River south of the falls, allowing water traffic to safely re-enter the Niagara River and proceed to Lake Erie.

Toronto Power Generating Station
Toronto Power Generating Station

The Toronto Power Generating Station is a former generating station located along the Niagara River in Niagara Falls, Ontario, Canada, slightly upstream from the newer Rankine power station. Completed in 1906 in the Beaux-Arts-style, the station was designed by architect E. J. Lennox and was built by the Electrical Development Company of Ontario (owned by William Mackenzie, Frederic Thomas Nicholls, and Henry Mill Pellatt) under supervision of Hugh L. Cooper to supply hydro-electric power to nearby Toronto, Ontario.The plant is built on top of a deep wheel pit, with turbines at the bottom of the pit, turning generators at the top by means of long vertical shafts. The water from the turbines runs out through a brick-lined tailrace which eventually comes out at the base of the falls. In its prime, it had a generating capacity of 137,500 horsepower (102,500 kW).The plant ceased operations on February 15, 1974 as Ontario Hydro looked to make better use of the available water downriver at the Sir Adam Beck Hydroelectric Power Stations in Queenston. In addition, the plant produced "25 Cycle" electricity, now largely unused. The vacant plant was designated a National Historic Site of Canada in 1983, due to its importance in the development of business, industry and technology in Ontario, its status as the first wholly Canadian-owned hydro-electric facility at Niagara Falls, and the unusual application of Beaux-Arts design to an industrial plant.Ownership of the Toronto Power Generating Station was transferred to the Niagara Parks Commission in 2007. Structural assessments were subsequently undertaken in order to consider future adaptive reuse options for the facility. In its current empty state, the plant has been the subject of urban exploration activities.