place

Heydar Aliyev Baku Oil Refinery

Economy of BakuEnergy infrastructure completed in 1953Oil refineriesOil refineries in the Soviet UnionPetroleum industry in Azerbaijan
Petroleum infrastructure
Heydar Aliyev Baku Oil Refinery 3
Heydar Aliyev Baku Oil Refinery 3

The Heydar Aliyev Baku Oil Refinery (Azerbaijani: Heydər Əliyev adına Bakı Neft Emalı Zavodu) is an oil refinery located in Baku, Azerbaijan. It is currently the only oil refinery in Azerbaijan, capable of producing about 120,000 barrels (19,000 m3) of refined products per day. The refinery meets the entire domestic demand for petroleum products and exports more than 40% of the products. The plant processes 15 different products including gasoline, diesel, jet fuel, black oil, petroleum coke, asphalt, lubricants etc. It is owned and operated by SOCAR, which is the national oil company of the Azerbaijan Republic.

Excerpt from the Wikipedia article Heydar Aliyev Baku Oil Refinery (License: CC BY-SA 3.0, Authors, Images).

Heydar Aliyev Baku Oil Refinery
Baku

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Heydar Aliyev Baku Oil RefineryContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 40.406794 ° E 49.918732 °
placeShow on map

Address


1088 Baku (Nizami Raion)
Baku, Azerbaijan
mapOpen on Google Maps

Heydar Aliyev Baku Oil Refinery 3
Heydar Aliyev Baku Oil Refinery 3
Share experience

Nearby Places

SOFAZ Tower
SOFAZ Tower

SOFAZ Tower is a multi-story building located in Baku, the capital of Azerbaijan. This new skyscraper, the new administrative building of the State Oil Fund of the Republic of Azerbaijan (SOFAZ), is a unique project that incorporates the latest technological innovations that are in line with the highest international standards and elements of the 9 carpet schools in Azerbaijan. To build a new administrative building of the State Oil Fund of Azerbaijan (SOFAZ) under the Order No. 367s of the Cabinet of Ministers of the Republic of Azerbaijan dated December 29, 2009, 0.64 hectares of land in 6th Kondalan Street, Nizami district, were transferred to the balance of the Fund. On that day, President Ilham Aliyev attended the solemn laying ceremony of his foundation. On December 20, 2011, N.V. Besix S.A. a bilateral agreement on construction was signed with the company-builder [1]. After that, the active phase of the construction of the SOFAZ Tower building started. N.V. Besix S.A. the company won the tender as a result of the procurement tender following Article 48 of the Law of the Republic of Azerbaijan "On public procurement" based on the agreement of the State Procurement Agency of the Republic of Azerbaijan and on December 20, 2011, the State Oil Fund and Besix-Az Besix consortium a relevant procurement contract was signed for €84,916,000. Local and foreign subcontractors have been involved in the construction of the building by the general contractor. The construction and design work of the building has been completed over 5 years. The construction project of the building was developed by the French company "Inter Art Etudes". The construction process was carried out under the auspices of the American company AECOM, "N.V. Besix SA "