West Station (MBTA)
West Station is a planned station on the MBTA Commuter Rail Framingham/Worcester Line, to be located in the former Beacon Park Yard in Allston, Massachusetts. It was initially proposed as part of a project to straighten the Massachusetts Turnpike through the yard, allowing much of the land to be redeveloped. Initially to serve solely as a conventional commuter rail station, West Station is designed to eventually serve high-frequency diesel multiple unit service on the inner Worcester Line and on the Grand Junction Railroad. By July 2016, the state planned to file a Draft Environmental Impact Statement (DEIS) for the project in 2017 and hoped to break ground in 2019. It was then estimated to cost $25 million, to be split between Harvard University (which owns the surrounding land), the state, and a third party (intended to be Boston University pending negotiations). In December 2017, the state announced that the station cost had increased to $95 million, and that it would not open until 2040. In January 2018, Harvard increased its pledge to $50 million, with an additional $8 million incentive to build an interim station.
Excerpt from the Wikipedia article West Station (MBTA) (License: CC BY-SA 3.0, Authors, Images).West Station (MBTA)
Ashford Street, Boston Allston
Geographical coordinates (GPS) Address Nearby Places Show on map
Continue reading on Wikipedia
Geographical coordinates (GPS)
Latitude | Longitude |
---|---|
N 42.354780555556 ° | E -71.121561111111 ° |
Address
Ashford Street 120
02134 Boston, Allston
Massachusetts, United States
Open on Google Maps