place

Downsview Park station

2017 establishments in OntarioGO Transit railway stationsLine 1 Yonge–University stationsRailway stations in Canada opened in 2017Use mdy dates from October 2021
Downsview Park Platform
Downsview Park Platform

Downsview Park is a rapid transit station on Line 1 Yonge–University of the Toronto subway and a commuter rail station on the Barrie commuter rail line of GO Transit. Subway service began on December 17, 2017, and GO Train service began on December 30, 2017. Downsview Park station is a fully integrated multi-modal transit facility serving both transit lines. This is in contrast to other interchanges between TTC subway and GO Transit rail lines, which have separate structures for each agency. TTC ridership statistics for 2018 showed that Downsview Park was the least used station on the heavy-rail subway system, displacing Bessarion on Line 4 Sheppard.

Excerpt from the Wikipedia article Downsview Park station (License: CC BY-SA 3.0, Authors, Images).

Downsview Park station
Vitti Street, Toronto

Geographical coordinates (GPS) Address External links Nearby Places
placeShow on map

Wikipedia: Downsview Park stationContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 43.753888888889 ° E -79.478333333333 °
placeShow on map

Address

Downsview Park

Vitti Street 25
M3J 2W6 Toronto (North York)
Ontario, Canada
mapOpen on Google Maps

linkWikiData (Q4120238)
linkOpenStreetMap (660222510)

Downsview Park Platform
Downsview Park Platform
Share experience

Nearby Places