Green Mountain Wind Energy Center
The Green Mountain Wind Energy Center was a wind power plant near Garrett, Somerset County, Pennsylvania with eight Nordex 1.3 MW turbines that began commercial operation in May 2000. This was the first commercial wind farm constructed in Pennsylvania. The wind farm had a combined total nameplate capacity of 10.4 MW and the potential to produce about 27,000 megawatt-hours of electricity annually, enough to power 3,300 homes, assuming a 30% capacity factor. The wind farm was developed by National Wind Power of the UK, now part of NPower Renewables, operated by NextEra Energy Resources, based in Florida. Energy from the wind farm was purchased and sold by Green Mountain Energy based in Texas, and was the first commercial wind farm for Green Mountain Energy. In 2016 the wind farm was dismantled and replaced with new battery technology.
Excerpt from the Wikipedia article Green Mountain Wind Energy Center (License: CC BY-SA 3.0, Authors).Green Mountain Wind Energy Center
Schrock Road, Summit Township
Geographical coordinates (GPS) Address Nearby Places Show on map
Continue reading on Wikipedia
Geographical coordinates (GPS)
Latitude | Longitude |
---|---|
N 39.849480555556 ° | E -79.068363888889 ° |
Address
Schrock Road
Schrock Road
15542 Summit Township
Pennsylvania, United States
Open on Google Maps