place

Harshaville, Pennsylvania

Pittsburgh metropolitan areaUnincorporated communities in Beaver County, PennsylvaniaUnincorporated communities in PennsylvaniaUse mdy dates from July 2023Western Pennsylvania geography stubs

Harshaville is an unincorporated community in Hanover Township, Beaver County, Pennsylvania, United States. It is located near the junction of Pennsylvania Route 18 and U.S. Route 30, near Raccoon Creek State Park. The community is located at the terminus of Pennsylvania Route 151.

Excerpt from the Wikipedia article Harshaville, Pennsylvania (License: CC BY-SA 3.0, Authors).

Harshaville, Pennsylvania
Lincoln Highway, Hanover Township

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Harshaville, PennsylvaniaContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 40.541666666667 ° E -80.410555555556 °
placeShow on map

Address

Lincoln Highway

Lincoln Highway
15050 Hanover Township
Pennsylvania, United States
mapOpen on Google Maps

Share experience

Nearby Places

Shippingport Atomic Power Station
Shippingport Atomic Power Station

The Shippingport Atomic Power Station was (according to the US Nuclear Regulatory Commission) the world's first full-scale atomic electric power plant devoted exclusively to peacetime uses. It was located near the present-day Beaver Valley Nuclear Generating Station on the Ohio River in Beaver County, Pennsylvania, United States, about 25 miles (40 km) from Pittsburgh. The reactor reached criticality on December 2, 1957, and aside from stoppages for three core changes, it remained in operation until October 1982. The first electrical power was produced on December 18, 1957 as engineers synchronized the plant with the distribution grid of Duquesne Light Company.The first core used at Shippingport originated from a cancelled nuclear-powered aircraft carrier and used highly enriched uranium (93% U-235) as "seed" fuel surrounded by a "blanket" of natural U-238, in a so-called seed-and-blanket design; in the first reactor about half the power came from the seed. The first Shippingport core reactor turned out to be capable of an output of 60 MWe one month after its launch. The second core was similarly designed but more powerful, having a larger seed. The highly energetic seed required more refueling cycles than the blanket in these first two cores.The third and final core used at Shippingport was an experimental, light water moderated, thermal breeder reactor. It kept the same seed-and-blanket design, but the seed was now uranium-233 and the blanket was made of thorium. Being a breeder reactor, it had the ability to transmute relatively inexpensive thorium to uranium-233 as part of its fuel cycle. The breeding ratio attained by Shippingport's third core was 1.01. Over its 25-year life, the Shippingport power plant operated for about 80,324 hours, producing about 7.4 billion kilowatt-hours of electricity.Owing to these peculiarities, some non-governmental sources label Shippingport a "demonstration PWR reactor" and consider that the "first fully commercial PWR" in the US was Yankee Rowe. Criticism centers on the fact that the Shippingport plant had not been built to commercial specifications. Consequently, the construction cost per kilowatt at Shippingport was about ten times those for a conventional power plant.