place

Đà Nẵng station

Asian railway station stubsBuildings and structures in Da NangPages with no open date in Infobox stationRailway stations in VietnamVietnam transport stubs
Vietnamese building and structure stubs
Da Nang Train Stn Front
Da Nang Train Stn Front

Đà Nẵng station is one of the main railway stations on the North–South Railway (Reunification Express) in Vietnam and one of the five largest stations in Vietnam. It serves the city of Đà Nẵng. Đà Nẵng station is one of the three largest train stations of Vietnam serving daily trains from the north to the south and vice versa that stop for long enough for a relatively large number of passengers to get on or off. The facilities of Đà Nẵng station are relatively modern, secure and hygienic. Besides North–South routes, the station serves provincial routes such as to Huế, Quảng Bình, Vinh, Quy Nhon, and Ho Chi Minh City. Passengers have diverse options with different classes to any of these stations: odd numbers (E1, S1, S3, S5, S7 and SD1) go from the north to the south coded, even numbers (E2, S2, S4, S6 and S8) go from the south to the north.

Excerpt from the Wikipedia article Đà Nẵng station (License: CC BY-SA 3.0, Authors, Images).

Đà Nẵng station
Hai Phong, Đà Nẵng Thanh Khê (Thanh Khê District)

Geographical coordinates (GPS) Address External links Nearby Places
placeShow on map

Wikipedia: Đà Nẵng stationContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 16.0716 ° E 108.2092 °
placeShow on map

Address

Đà Nẵng

Hai Phong
50207 Đà Nẵng, Thanh Khê (Thanh Khê District)
Vietnam
mapOpen on Google Maps

linkWikiData (Q3096350)
linkOpenStreetMap (10553910677)

Da Nang Train Stn Front
Da Nang Train Stn Front
Share experience

Nearby Places

Museum of Cham Sculpture
Museum of Cham Sculpture

The Museum of Cham Sculpture (French: Musée de la Sculpture cham) is a museum located in Hải Châu District, Đà Nẵng, central Vietnam, near the Han River. The establishment of a Cham sculpture museum in Da Nang was first proposed in 1902 by the Department of Archaeology of EFEO. Henri Parmentier, a prominent archaeologist of the department, made great contributions to the campaign for its construction. Reportedly founded in 1915 as the Musée Henri Parmentier, its first building opened in 1919 and was designed by two French architects, M. Deleval and M. Auclair, who were inspired by Parmentier to use some traditional Cham elements in the composition. Prior to the establishment of the museum, the site was known as the "garden of sculptures" and many Cham sculptures that had been collected in Da Nang, Quảng Nam and elsewhere had been brought there over the preceding twenty years. The museum has been expanded twice. The first expansion was in the mid-1930s, with two new galleries providing display space for the objects added in the 1920s and 1930s. Henri Parmentier directed the display based on the areas where sculptures were found. The 1000 meter square of floor space was arranged for the collections of Mỹ Sơn, Trà Kiệu, Đồng Dương, Tháp Mẫm, Quang Tri, Quảng Ngãi, Bình Định and Kon Tum. In 2002, the Museum was again expanded with the two-story building providing an additional 1000 square meters. The new building provides not only space for display, but also for storage, a library, a restoration workshop and offices for staff. Before 2007, the Museum was managed by Da Nang Museums, an administrative organ in charge of the city's museums and heritage. In 2008 it became affiliated with the city Department of Culture, Sport and Tourism. The museum houses the world's largest collection of Cham sculpture and is a popular tourist destination.

Dragon Bridge (Da Nang)
Dragon Bridge (Da Nang)

The Dragon Bridge (Vietnamese: Cầu Rồng) is a bridge over the River Hàn at Da Nang, Vietnam. Construction of the bridge began on 19 July 2009 (the same day as the inauguration of the nearby Thuận Phước Bridge) when the former Prime Minister of Vietnam Nguyen Tan Dung and many high-ranking government officials attended the groundbreaking ceremony.Dragon Bridge is 666m long, 37.5m wide and has six lanes for traffic. It opened to traffic on March 29, 2013, at a cost of nearly VND 1.5 trillion dong (US$88m). The bridge was designed by the US-based Ammann & Whitney Consulting Engineers with Louis Berger Group. Construction was undertaken by Company No. 508, an affiliate of Civil Construction Engineering Corporation No.5, and Bridge Company No. 75. The main span was completed on October 26, 2012. The bridge was opened to traffic on March 29, 2013, the 38th anniversary of the capture of Da Nang City by North Vietnamese forces (known as the Liberation of Da Nang in Vietnam) during the Vietnam War (known as the American War in Vietnam).This modern bridge crosses the Han River at the Le Dinh Duong/Bach Dang traffic circle, providing the shortest road link from the Da Nang International Airport to other main roads in Da Nang city, and a more direct route to My Khe Beach and Non Nuoc Beach on the eastern edge of the city. The bridge was designed and built in the shape of a dragon and to breathe fire and water each Friday, Saturday and Sunday night at 9 pm.