place

Grayling Bicycle Turnpike

Hiking trails in MichiganLower Peninsula, Michigan geography stubsProtected areas of Crawford County, MichiganTransportation in Crawford County, MichiganUnited States trail stubs

The Grayling Bicycle Turnpike is a multiple-use, non-motorized paved trailway in Michigan, about 6.5 miles (10.5 km) long. It begins at the entrance to Hartwick Pines State Park and runs southerly along M-93, eventually meeting Business Loop Interstate 75 (BL I-75) and ending at East Michigan Avenue. The turnpike is used for a stretch of the Avita Water Black Bear Bicycle Tour, which coincides with the Au Sable River Canoe Marathon and shadows the route of the canoes over the roadways, beginning in Grayling and ending in Oscoda.

Excerpt from the Wikipedia article Grayling Bicycle Turnpike (License: CC BY-SA 3.0, Authors).

Grayling Bicycle Turnpike
Hartwick Pines Road, Grayling Charter Township

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Grayling Bicycle TurnpikeContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 44.7098 ° E -84.70997 °
placeShow on map

Address

Hartwick Pines Road 1709
49738 Grayling Charter Township
Michigan, United States
mapOpen on Google Maps

Share experience

Nearby Places