The Portlands Energy Centre is a 550-megawatt natural gas electrical generating station in Toronto, Ontario. It is located in the Port Lands area of the Toronto waterfront at 470 Unwin Avenue, adjacent to the site of the decommissioned Hearn Generating Station.

Excerpt from the Wikipedia article Portlands Energy Centre (License: CC BY-SA 3.0, Authors, Images).

Portlands Energy Centre
Unwin Avenue, Toronto

Geographical coordinates (GPS) Address External links Nearby Places
placeShow on map

Wikipedia: Portlands Energy CentreContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 43.649444444444 ° E -79.330833333333 °
placeShow on map

Address

Portlands Energy Centre

Unwin Avenue 470
M5A 1A1 Toronto
Ontario, Canada
mapOpen on Google Maps

linkWikiData (Q7232096)
linkOpenStreetMap (176711932)

Portlands Energy Centre Toronto, Ontario, Canada
Portlands Energy Centre Toronto, Ontario, Canada
Share experience

Nearby Places

Coal in Canada

Coal reserves in Canada rank 13th largest in the world (following the former Soviet Union, the United States, the People's Republic of China and Australia) at approximately 10 billion tons, 0.6% of the world total. This represents more energy than all of the oil and gas in the country combined. The coal industry generates CDN$5 billion annually. Most of Canada's coal mining occurs in the West of the country. British Columbia operates 9 coal mines, Alberta nine, Saskatchewan three and New Brunswick one. Nova Scotia operates several small-scale mines, Westray having closed following the 1992 disaster there.In 2005, Canada produced 67.3 million tons of coal and its consumption was 60 million tons. Of this 56 million tons were used for electricity generation. The remaining four million tons was used in the steel, concrete and other industries. The largest consumers of coal in Canada were Alberta and Ontario. In 1997, Alberta accounted for 47% of Canada's coal consumption at 26.2 million tons, and Ontario accounted for 25% at 13.8 million tons. Saskatchewan, Manitoba, Nova Scotia and New Brunswick also use coal to generate electricity to varying degrees.In 2016, The Government of Canada decided to phase out the use of coal-fired power plants by 2030 in order to meet its Paris climate agreement commitments. The decision affected 50 communities dependent on a nearby coal mine or power plant for its economy, and 3,000 to 3,900 workers who worked in the 13 power stations and 9 nearby mines that were still active in 2016 across Alberta, Saskatchewan, New Brunswick and Nova Scotia. In November 2017 the Government of Canada co-founded the Powering Past Coal Alliance. As of January 2022 only 9 operational coal-fired power stations remain in Canada.

Ashbridges Bay Wastewater Treatment Plant
Ashbridges Bay Wastewater Treatment Plant

The Ashbridges Bay Wastewater Treatment Plant is the city of Toronto's main sewage treatment facility, and the second largest such plant in Canada after Montreal's Jean-R. Marcotte facility. One of four plants that service the city of Toronto, it treats the wastewater produced by some 1.4 million of the city's residents and has a rated capacity of 818,000 (design capacity of 1,000,000) cubic metres per day. Until 1999 it was officially known as the Main Treatment Plant. The plant has a 185 m (607 ft) high smokestack which is visible from most parts of the city. The plant opened in 1910. Prior to this, Toronto's sewage flowed directly into Lake Ontario and a layer of thick sludge covered the lake to a distance of several hundred feet from shore. The lake was also the source of the city's drinking water and the pollution contributed to a major typhoid outbreak. The plant is located on the shore of Lake Ontario at the foot of Leslie Street at Ashbridge's Bay. To the west is the Port Lands area, a once heavily industrial area that is now mostly deserted. To the north is the Leslieville neighbourhood. When the plant was built, it was on the eastern edge of the city, far away from most residents. It is now surrounded by residential areas and strenuous efforts have been made to reduce odours and pollution. Most notable was the shuttering of the plant's incinerators in 1987. An odour control study was completed in 2002 and, beginning in 2002, the area around the plant was also redesigned into a large landscaped park. In 2005, a contract was awarded to design and construct a new odour control system.Until recently, all the sludge has been trucked off site. However, summer 2007 saw odour problems, with the Michigan landfill closed and the city removing only 6 of every 10 truckloads of sludge produced, leaving the rest in an aeration slough until autumn when agricultural applications for sludge resumed.