place

Full-Reuenthal

Cultural property of national significance in AargauMunicipalities of Aargau
Full Reuenthal Brunnen 104
Full Reuenthal Brunnen 104

Full-Reuenthal is a municipality in the district of Zurzach in the canton of Aargau in Switzerland.

Excerpt from the Wikipedia article Full-Reuenthal (License: CC BY-SA 3.0, Authors, Images).

Full-Reuenthal
Unterdorf, Full-Reuenthal

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Full-ReuenthalContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 47.616666666667 ° E 8.2 °
placeShow on map

Address

Unterdorf 34
5324 Full-Reuenthal
Aargau, Switzerland
mapOpen on Google Maps

Full Reuenthal Brunnen 104
Full Reuenthal Brunnen 104
Share experience

Nearby Places

Leibstadt Nuclear Power Plant
Leibstadt Nuclear Power Plant

The Leibstadt Nuclear Power Plant (German: Kernkraftwerk Leibstadt, KKL) is located near Leibstadt, canton of Aargau, Switzerland, on the Rhine River and close to the border to Germany. Commissioned in 1984, it is the youngest and most powerful of the country's four operating reactors. Its General Electric built boiling water reactor produces 1,220 MW of electrical power. The nuclear power station has produced approximately 8.5 TWh per year, slightly less than the power station Gösgen. It is owned by Leibstadt AG (KKL), a consortium of six Swiss energy companies: the Aare Tessin AG for electricity (Atel) with 27%, the northeast power stations AG (NOK) with 23%, the central-Swiss power stations AG (CKW) with 14%, the electricity company Laufenburg AG (EGL) with 16%, the Bern power stations AG (BKW FMB energy AG) with 10% and the Aargauer of power stations AG (AEW energy AG) with 5%. The management was originally done by the EGL, but with establishment of the Axpo it was consolidated within the Axpo group, so whereby today the NOK is the manager. The plant also houses a 380 kV switchyard for Beznau. Planning for the KKL began in 1964 for a 600 MW reactor. The Swiss Federal Council opposed direct cooling by river water, replaced in the design in 1971 with a cooling tower. During further planning the output was increased to 900 and then 1200 MW. In the wake of the 1979 Three Mile Island accident new safety regulations were implemented, delaying completion for several years. The 2 billion Swiss franc construction budget spiraled to over 5 billion before the plant opened in 1984 after eleven years of construction. With the installation of a new low pressure turbine in 2010 Leibstadt achieved an increase of 40 megawatts. A new 420 Tonne generator, the heaviest AIL to be carried on Switzerland's roads, has significantly improved the power plants performance. The history of the completion of the KKL reflected increasingly critical attitudes toward nuclear power in Switzerland during the 1970s and 1980s, which culminated in the resistance against the Kaiseraugst Nuclear Power Plant.