place

Concorde Tower

2009 establishments in the United Arab EmiratesResidential skyscrapers in DubaiTowers completed in 2009United Arab Emirates building and structure stubs
Concorde Tower Under Construction on 15 May 2008
Concorde Tower Under Construction on 15 May 2008

The Concorde Tower is a 45-floor tower in the Jumeirah Lake Towers Free Zone in Dubai, United Arab Emirates. The residential tower, which is estimated to cost US$120 million to construct, has a total structural height of 190 m (623 ft). The developer said the building was to be completed in December 2007. Due to the force majeure situations, building got completed in February 2009, and ready for use on April 2009.

Excerpt from the Wikipedia article Concorde Tower (License: CC BY-SA 3.0, Authors, Images).

Geographical coordinates (GPS)

Latitude Longitude
N 25.069727777778 ° E 55.144547222222 °
placeShow on map

Address

Concorde Tower

Cluster H
, Jumeirah Lakes Towers
Dubai, United Arab Emirates
mapOpen on Google Maps

linkWikiData (Q5158939)
linkOpenStreetMap (160092608)

Concorde Tower Under Construction on 15 May 2008
Concorde Tower Under Construction on 15 May 2008
Share experience

Nearby Places

Synergy University Dubai Campus

Synergy University Dubai Campus is a branch campus of Synergy University (Russian: Университет Синергия) or Moscow University for Industry and Finance “Synergy” (Russian: Московский финансово-промышленный университет «Синергия») based in Dubai. Synergy University is an institution for higher education aimed at combining traditional academic teaching with fundamental knowledge & practical orientation, also Synergy University is one of the largest universities in Eastern Europe with 35000+ students, 40 regional units & wide international representation in different countries of the world, including United Arab Emirates and Russian Federation.Licensed by The Federal Education and Science Supervision Agency (Ministry of Education and Science of the Russian Federation), Synergy University’s MA & MBA Programs are internationally accredited by the Association of MBA’s (AMBA, UK).It is the 1st Russian university accredited by the Association of MBAs (AMBA) and granted a certificate of Unique Quality Label issued by the European Foundation for Quality in e-Learning.The university has representative offices in London, Beijing, Singapore and fully fetched campus in Dubai (United Arab Emirates). Internationally, Synergy University is developing its collaboration with foreign universities and foundations in the field of joint educational programs and providing funds for design and scientific activities of undergraduates. And its international efforts are supported by its international advisory board. Furthermore, Synergy University sponsors its proprietary Business Incubator as well as manages a dedicated Venture Capital Fund “Synergy Innovations” promoting young entrepreneurial minds and technologies.It runs a in-house TV channel “Synergy TV” in Dubai while maintaining an internal publishing house “Synergy Press”.

Jumeirah Lake Towers
Jumeirah Lake Towers

The Jumeirah Lakes Towers (JLT) (Arabic: أبراج بحيرات الجميرا) is a large development in Dubai, United Arab Emirates which consists of 80 towers being constructed along the edges of three artificial lakes (Lake Almas West, Lake Almas East, JLT Lake) as well as the JLT Embankment of eight towers facing Jumeirah Islands. Initially JLT had four lakes (Lake Almas West, Lake Almas East, Lake Elucio, Lake Allure), in late 2012 developer (DMCC) announced that lake Elucio would be drained and 55,000 m2 (590,000 sq ft) park would be created instead. Subsequently, Lake Allure has been renamed to JLT Lake. The total area covered by the lakes, waterways and landscaping will be 730,000-square-metre (7,900,000 sq ft). The towers will range from having 35 floors to having 45, except for the centerpiece (Almas Tower), which is 66 floors. The tallest tower and the centerpiece of the entire complex is Almas Tower which is situated on its own island between Lake Almas West and Lake Almas East. The completion of Saba Tower in December 2006 marked the first tower to be completed in Jumeirah Lakes Towers. The majority of construction took place in 2008. By April 2011, over 80 percent of the towers in JLT was claimed to have been completed. As of June 2015 there were reported to still be 11 towers being either left undone due to the 2009 crisis or still undergoing construction in JLT. The most prominent of these are Wind Tower 1 and Wind Tower 2 that are part of Cluster B and right on Shk. Zayed Road - they are under construction since more than 12 years.