place

Steel Winds

2007 establishments in New York (state)Buildings and structures in Erie County, New YorkEnergy infrastructure completed in 2012Pages containing links to subscription-only contentWind farms in New York (state)
Steel Winds 2007
Steel Winds 2007

Steel Winds (or Steel Winds I & Steel Winds II) is a wind energy project located on the coast of Lake Erie in Lackawanna, New York, just south of the City of Buffalo in Erie County. Its first phase was operational in 2007 and the second phase came online in 2012, for a combined production capacity of 35 MW. The unique project was built on part of the brownfield of a former Bethlehem Steel plant. By using much of the existing infrastructure of roads and transmission lines, it could reduce project costs. It is one of the largest urban wind farms in the world and uses turbines manufactured in Iowa.

Excerpt from the Wikipedia article Steel Winds (License: CC BY-SA 3.0, Authors, Images).

Geographical coordinates (GPS)

Latitude Longitude
N 42.8 ° E -78.866666666667 °
placeShow on map

Address

Erie County



New York, United States
mapOpen on Google Maps

Steel Winds 2007
Steel Winds 2007
Share experience

Nearby Places

Buffalo Stamping Plant
Buffalo Stamping Plant

Buffalo Stamping Plant manufactures sheetmetal stampings and welded sub-assemblies for Ford Motor Company's automotive car and truck assembly plants in the USA, Canada and Mexico. The facility was opened in 1950 with 1,235,895 square feet (114,818.4 m2) of working floor space. It has had six major expansions and the facility is now at 2,452,883 square feet (227,880.3 m2) or 53.3 acres (216,000 m2) of floor space. Buffalo Stamping is currently in the process of adding 30,000 square feet on to the structure. The plant is located on an 88-acre (360,000 m2) site at the Eastern end of Lake Erie near the city of Buffalo, New York. The facility processes over 1,700 tons of steel each day and ships an average of 100 rail cars of parts manufactured daily. During the year, over 425,000 tons of steel are received for manufacturing at the facility. The facility has 20 major press stamping lines that include several transfer presses which include some of the world's largest. One of those large transfer presses is the Schuler. This press is 162 feet (49 m) long, 49 feet (15 m) high from the basement to the top of the crown and weights in excess of 7,000,000 pounds. Buffalo Stamping supplies components to two Ford Motor Company assembly plants: Oakville Assembly which assembles the Ford Edge, and Lincoln MKX, and the Kentucky Truck Plant. The facility supplies a total of 15 facilities, including Ford assembly plants and Ford part distribution depots. The facility recently received a recommendation for endorsement to the International ISO 14001 Standard for Environmental Management Systems. Buffalo Stamping Plant is the first major stamping facility in North America to receive this endorsement. Buffalo Stamping is also certified to ISO 9001 International Standard for Quality since 1996.