place

Holyoake House

Grade II listed buildings in ManchesterGrade II listed office buildingsOffice buildings in Manchester
Holyoake House, Manchester
Holyoake House, Manchester

Holyoake House is a building in the NOMA district of Manchester, England, which was completed in 1911. Designed by F.E.L. Harris, it was built for the Co-operative Union in memory of George Holyoake. It is located alongside other listed buildings such as the CIS Tower, Hanover Building and Redfern Building and is owned by Co-operatives UK.

Excerpt from the Wikipedia article Holyoake House (License: CC BY-SA 3.0, Authors, Images).

Holyoake House
Hanover Street, Manchester City Centre

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Holyoake HouseContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 53.486434 ° E -2.239353 °
placeShow on map

Address

Co-operatives UK

Hanover Street
M60 0AS Manchester, City Centre
England, United Kingdom
mapOpen on Google Maps

Holyoake House, Manchester
Holyoake House, Manchester
Share experience

Nearby Places

One Angel Square
One Angel Square

One Angel Square is a high-rise office building in Manchester, England. Construction work began in 2010 and was completed in February 2013. The landmark building is the head office of the Co-operative Group. Standing 72.5 metres (238 ft) tall, the building forms the centrepiece of the £800 million NOMA development in the Angel Meadows area of Manchester city centre. The building cost at least £105 million to construct and was sold on leaseback terms in 2013 for £142 million. One Angel Square is one of the most sustainable large buildings in Europe and is built to a BREEAM 'Outstanding' rating. It is powered by a biodiesel cogeneration plant using rapeseed oil to provide electricity and heat. The structure makes use of natural resources, maximising passive solar gain for heat and using natural ventilation through its double-skin façade, adiabatic cooling, rainwater harvesting, greywater recycling and waste heat recycling.The building's distinctive form has been compared to a sliced egg and a ship. Its design was announced by architects 3DReid in May 2009 and construction began in July 2010, with a projected completion date in March 2013. In December 2012, the scheme surpassed its pan-European sustainability aims and achieved a world-record BREEAM score of 95.32%. It is also an energy-plus building, producing surplus energy and zero carbon emissions. The building has received numerous awards for its striking aesthetic and sustainability aims.