Philippsburg Nuclear Power Plant
Buildings and structures in Karlsruhe (district)Economy of Baden-WürttembergEnergy infrastructure completed in 1979Former nuclear power stations in GermanyGerman power station stubs
The Philippsburg Nuclear Power Plant is located in Philippsburg, Karlsruhe (district), Germany. The plant was operated by EnBW Kernkraft GmbH. As part of Germany's phase out of nuclear energy (Atomausstieg), unit 1 was shut down in 2011 and unit 2 in 2019. Demolition of conventional structures began in January 2020. The process of decommissioning is underway as of January 2020 beginning with defueling and dismantling of primary coolant lines. The plants operator EnBW expects the decommissioning process to take around 10-15 years.
Excerpt from the Wikipedia article Philippsburg Nuclear Power Plant (License: CC BY-SA 3.0, Authors, Images).Philippsburg Nuclear Power Plant
Verwaltungsverband Philippsburg
Geographical coordinates (GPS) Address Nearby Places Show on map
Continue reading on Wikipedia
Geographical coordinates (GPS)
Latitude | Longitude |
---|---|
N 49.2525 ° | E 8.4363888888889 ° |
Address
76661 Verwaltungsverband Philippsburg, Philippsburg
Baden-Württemberg, Germany
Open on Google Maps