Fuller Warren Bridge
The Fuller Warren Bridge is the prestressed-concrete girder bridge that carries Interstate 95 (I-95) across the St. Johns River in Jacksonville, Florida. The current structure was finished in October 2002, replacing the original bascule-bridge span, finished in 1954. The current bridge was designed by HNTB Corporation in 1990 and built by Balfour Beatty Construction. It is over 7,500 ft (2,286 m) long, with a main span of 250 feet (76 m), and a vertical clearance of 75 ft (23 m). It carries eight lanes across the span. In the Spring of 2018 a construction project began to add two more lanes and a shared-use path to the bridge, with anticipated completion in Summer 2022. The eastern end of the transcontinental Interstate 10 (I-10) meets I-95 just west of the bridge.
Excerpt from the Wikipedia article Fuller Warren Bridge (License: CC BY-SA 3.0, Authors, Images).Fuller Warren Bridge
Riverside Park Place, Jacksonville
Geographical coordinates (GPS) Address External links Nearby Places Show on map
Geographical coordinates (GPS)
| Latitude | Longitude |
|---|---|
| N 30.315 ° | E -81.67166667 ° |
Address
Fuller Warren Bridge
Riverside Park Place
32204 Jacksonville
Florida, United States
Open on Google Maps