Waaban Crossing
2022 establishments in OntarioBridges completed in 2022Bridges over the Rideau CanalBuildings and structures in Kingston, OntarioRoad bridges in Ontario ... and 3 more
Transport in Kingston, OntarioUse Canadian English from January 2026Use mdy dates from April 2026
The Waaban Crossing (known as the Third Crossing bridge during development) is a 1.2-kilometre (0.75 mi) crossing of the Rideau Canal on the Cataraqui River in Kingston, Ontario, linking John Counter Boulevard on the western side of the river with Gore Road on the eastern side. The bridge opened in December 2022, at a cost of $180 million funded by equal contributions from the city, provincial, and federal governments. The bridge has one vehicle lane in each direction for road traffic, and a multimodal lane for pedestrians and cyclists.
Excerpt from the Wikipedia article Waaban Crossing (License: CC BY-SA 3.0, Authors).Waaban Crossing
Waaban Crossing, Kingston
Geographical coordinates (GPS) Address Nearby Places Show on map
Geographical coordinates (GPS)
| Latitude | Longitude |
|---|---|
| N 44.2586 ° | E -76.4725 ° |
Address
Waaban Crossing (Third Crossing)
Waaban Crossing
K7K 6Y1 Kingston
Ontario, Canada
Open on Google Maps