Two Creeks Solar Park
The Two Creeks Solar Park is a 150 MW solar photovoltaic energy station in Manitowoc County, Wisconsin. Ownership is shared between Wisconsin Public Service Corporation (WPS) and Madison Gas and Electric (MG&E), at 100 MW and 50MW, respectively. It was the first utility-scale solar plant approved and constructed in Wisconsin. The facility consists of approximately 533,000 PV panels on single-axis tracking systems. PV panels are Jinko Eagle HC mono-crystalline measuring approximately 2 meters by 1 meter and rated at 400 watts (i.e. maximum output). The total DC output rating of the facility is 213 MW. The facility covers approximately 800 acres within the towns of Two Creeks and Two Rivers, southwest of the nearby Point Beach Nuclear Plant. Construction for the plant was completed in November 2020 at a cost of $195 million. As part of project application materials, the facility was expected to require three full-time staff once constructed. The facility is eligible for the Federal Solar Investment Tax Credit (ITC). The ITC is normalized over the 30 year life of the project as required by the IRS.
Excerpt from the Wikipedia article Two Creeks Solar Park (License: CC BY-SA 3.0, Authors, Images).Two Creeks Solar Park
Meyer Road, Town of Two Creeks
Geographical coordinates (GPS) Address Nearby Places Show on map
Geographical coordinates (GPS)
| Latitude | Longitude |
|---|---|
| N 44.247777777778 ° | E -87.543333333333 ° |
Address
Meyer Road 12416
54241 Town of Two Creeks
Wisconsin, United States
Open on Google Maps