Kaohsiung Marriott Hotel
2020 establishments in TaiwanBuildings and structures in KaohsiungHotel buildings completed in 2020Skyscraper hotels in Kaohsiung
The Kaohsiung Marriott Hotel (traditional Chinese: 高雄萬豪酒店; simplified Chinese: 高雄万豪酒店; pinyin: Gāoxióng Wànháo Jiǔdiàn) is a 156 m (512 ft) skyscraper hotel completed in 2020 in Gushan District, Kaohsiung, Taiwan. The building has a floor area of 257,007.74 m2 (2,766,408.3 sq ft), and it comprises 31 floors above ground and six basement levels. The building is phase one of the E SKY LAND complex. Operated by Marriott Hotels & Resorts, the hotel has started trial operations on December 25, 2020 and will start operating fully on April 3, 2021.
Excerpt from the Wikipedia article Kaohsiung Marriott Hotel (License: CC BY-SA 3.0, Authors, Images).Kaohsiung Marriott Hotel
Longdesin Road, Kaohsiung Gushan District
Geographical coordinates (GPS) Address Nearby Places Show on map
Continue reading on Wikipedia
Geographical coordinates (GPS)
Latitude | Longitude |
---|---|
N 22.654692408079 ° | E 120.30661481419 ° |
Address
Longdesin Road 222號
804 Kaohsiung, Gushan District
Taiwan
Open on Google Maps