Garden Reach Flyover
2018 establishments in West BengalBridges completed in 2018Bridges in KolkataUse Indian English from December 2022
The Garden Reach Flyover is a flyover connecting the Garden Reach area and Majerhat in the port area of South Kolkata. The 4.4 kilometres (2.7 mi) long and four-lane flyover was inaugurated by Chief Minister of West Bengal Mamata Banerjee on 9 March 2018. Flyover connecting Brooklyn crossing, close to Ramnagar at the Garden Reach end and terminating near Majherhat railway station. The four-lane flyover that has been set up by the Kolkata Metropolitan Development Authority (KMDA) at a cost of Rs 340 crore.
Excerpt from the Wikipedia article Garden Reach Flyover (License: CC BY-SA 3.0, Authors).Garden Reach Flyover
Kolkata Mominpur
Geographical coordinates (GPS) Address Nearby Places Show on map
Continue reading on Wikipedia
Geographical coordinates (GPS)
Latitude | Longitude |
---|---|
N 22.5257 ° | E 88.3068 ° |
Address
700027 Kolkata, Mominpur
West Bengal, India
Open on Google Maps