place

Princeton Cooperative

Housing cooperatives in the United States
The Princeton Cooperative Association Inc.
The Princeton Cooperative Association Inc.

The Princeton Cooperative is a housing cooperative located on Capitol Hill, Seattle, Washington. It was built as the Ansonia apartment house in 1906 and was incorporated as a co-op in 1948. The building has 25 member-owned units and one unit owned by the corporation that is an amenity rental. There are three floors with eight units per floor. One unit is located in the basement as is communal storage and laundry facilities. The co-op is equipped with Wave G fiber internet service.

Excerpt from the Wikipedia article Princeton Cooperative (License: CC BY-SA 3.0, Authors, Images).

Princeton Cooperative
15th Avenue, Seattle Capitol Hill

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Princeton CooperativeContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 47.617271 ° E -122.312364 °
placeShow on map

Address

15th Avenue 1726
98122 Seattle, Capitol Hill
Washington, United States
mapOpen on Google Maps

The Princeton Cooperative Association Inc.
The Princeton Cooperative Association Inc.
Share experience

Nearby Places

Bullitt Center
Bullitt Center

The Bullitt Center is a commercial office building at the intersection of the Central District neighborhood, and Capitol Hill, Seattle, Washington. It was officially opened on Earth Day, April 22, 2013. The Bullitt Center was designed to be the greenest commercial building in the world, and was certified as a "Living Building" by the International Living Future Institute in April 2015.It was built by the Bullitt Foundation, a non-profit group based in Seattle that focuses on urban ecology. The foundation is a tenant, occupying half of one floor in the six story building, with additional commercial tenants - including the University of Washington, Hammer & Hand, Sonos, Intentional Futures and PAE Consulting Engineers - occupying the rest of the building. The building is fully leased. Construction costs for the six-story, 52,000-square-foot (4,800 m2) building were $18.5 million, or $355 per square foot. Including land and soft costs, the cost is $32.5 million. For this price the building provided "tenant ready" space (as opposed to the typical "cold dark shell" that most commercial spaces deliver). The Bullitt Center was designed to have a 250-year lifespan. In 2016, the Bullitt Center produced nearly 30 percent more energy than it needed for all uses, from the solar panels on its roof. As a result, it is one of the largest "net positive" energy buildings in the world. Energy is generated by a large solar panel array (composed of 575 panels) on the roof of the building, along with energy conservation measures that cut the building's energy consumption to approximately 15% of a typical office building of similar size. In 2016, the Bullitt Center had an energy use intensity (EUI) of 12, compared to an average commercial building in Seattle with an EUI of 90 or more. Although the building is connected to the electricity grid and at times draws more power than it produces (especially during the Seattle's cloudy winter), at other times it produces enough surplus energy to "repay" such withdrawals, yielding annual net positive energy.Other features of the building include an onsite rainwater-to-potable water system, which will filter collected rainwater for all purposes once it is approved by regulators. There is also an onsite composting toilet system, the world's only 6-story system of its kind.Considered to be at the current cutting edge of green construction, the structure requires a number of technical, legal, and social innovations to achieve a high level of ecological performance. The long-term, 250-year design of the building created financing challenges, as banks were unfamiliar with and thus hesitant to back such a project, because commercial buildings are typically financed based on an assumed 40-year lifespan. The 52,000 gallon rainwater collection and UV light purification system has run into challenges with public health regulations, which require that water for consumption be chlorinated. The owners are working to meet regulatory requirements, using ceramic filters and adding chlorine. The builders have negotiated with building material suppliers to ensure their products did not contain any of over 360 toxic chemicals; the supplier of the building sealant, for instance, agreed to remove phthalates from their product so that the building could use it. The structure also includes social design elements to reduce consumer energy use: the building may provide immediate feedback on energy use and publicize energy consumption via a real-time energy dashboard.Additional features include 26 geothermal wells that extend 400 feet (120 m) into the ground, where the temperature is a constant 55 °F (13 °C). These wells help heat the building in the winter and cool it in summer. A heavy timber structure, all of the building's lumber is certified to standards set by the Forest Stewardship Council and it is the first commercial building in the U.S. to earn FSC Project Certification. Also, the building has no parking spaces—only bike racks.The buildings elevators have intentionally been installed out of sight to encourage people to use the staircase which has been prominently placed protruding from the façade allowing for a good view of the surrounding area.

First Methodist Protestant Church of Seattle
First Methodist Protestant Church of Seattle

First Methodist Protestant Church of Seattle (Capitol Hill United Methodist Church, Catalysis) is an historic building, originally built and used as a church, at 128 16th Avenue East in Seattle, Washington. It was built in 1906 and added to the National Register in 1993. The church that was originally housed in this building, First Methodist Protestant Church of Seattle, later known as Capitol Hill United Methodist Church, was founded by Rev. Daniel Bagley in 1865 and met in buildings in downtown Seattle until the construction of this building on Capitol Hill. In 1991, due to declining membership and increasing costs of building upkeep, the church moved out of the building. The building was renovated from a church to an office building in 2004, and is currently owned and occupied by Catalysis Corporation, a Seattle-based digital marketing agency. Neither the church nor the building should be confused with the First Methodist Episcopal Church of Seattle, which was founded in 1853 (the first church organized in Seattle), which was also once housed in an historic building (at Fifth Avenue and Marion Street in downtown Seattle) built in 1906. Prior to the construction of the 1906 buildings, when both congregations met downtown, they were disambiguated by calling the Methodist Episcopal church the "Little White Church" and the Methodist Protestant one the "Little Brown Church". When the Methodist Episcopal Church and the Methodist Protestant Church became a single denomination in 1939, the congregation that met in the Capitol Hill building that is the subject of this article changed their name from "First Methodist Protestant" to "Capitol Hill Methodist", while the downtown Methodist Episcopal congregation became simply "First Methodist Church"; decades later, another denominational merger led to both adding "United" to their names.