place

DESY

Buildings and structures in Altona, HamburgEducation in HamburgFree-electron lasersOrganisations based in HamburgParticle physics facilities
Physics institutesResearch institutes in GermanySynchrotron radiation facilities
CFEL DESY Hamburg
CFEL DESY Hamburg

The Deutsches Elektronen-Synchrotron (English German Electron Synchrotron) commonly referred to by the abbreviation DESY, is a national research center in Germany that operates particle accelerators used to investigate the structure of matter. It conducts a broad spectrum of inter-disciplinary scientific research in three main areas: particle and high energy physics; photon science; and the development, construction and operation of particle accelerators. Its name refers to its first project, an electron synchrotron. DESY is publicly financed by the Federal Republic of Germany, the States of Germany, and the German Research Foundation (DFG). DESY is a member of the Helmholtz Association and operates at sites in Hamburg and Zeuthen.

Excerpt from the Wikipedia article DESY (License: CC BY-SA 3.0, Authors, Images).

DESY
PETRA Süd-West, Hamburg Bahrenfeld (Altona)

Geographical coordinates (GPS) Address Website Nearby Places
placeShow on map

Wikipedia: DESYContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 53.575833333333 ° E 9.8794444444444 °
placeShow on map

Address

Deutsches Elektronen-Synchrotron DESY

PETRA Süd-West
22607 Hamburg, Bahrenfeld (Altona)
Germany
mapOpen on Google Maps

Website
desy.de

linkVisit website

CFEL DESY Hamburg
CFEL DESY Hamburg
Share experience

Nearby Places

HERA (particle accelerator)
HERA (particle accelerator)

HERA (German: Hadron-Elektron-Ringanlage, English: Hadron-Electron Ring Accelerator) was a particle accelerator at DESY in Hamburg. It began operating in 1992. At HERA, electrons or positrons were collided with protons at a center of mass energy of 318 GeV. It was the only lepton-proton collider in the world while operating. Also, it was on the energy frontier in certain regions of the kinematic range. HERA was closed down on 30 June 2007.The HERA tunnel is located under the DESY site and the nearby Volkspark around 15 to 30 m underground and has a circumference of 6.3 km. Leptons and protons were stored in two independent storage rings on top of each other inside this tunnel. There are four interaction regions, which were used by the experiments H1, ZEUS, HERMES and HERA-B. All these experiments were particle detectors. Leptons (electrons or positrons) were pre-accelerated to 450 MeV in the linear accelerator LINAC-II. From there they were injected into the storage ring DESY-II and accelerated further to 7.5 GeV before their transfer into PETRA, where they were accelerated to 14 GeV. Finally they were injected into their storage ring in the HERA tunnel and reached a final energy of 27.5 GeV. This storage ring was equipped with warm (non-superconducting) magnets keeping the leptons on their circular track by a magnetic field of 0.17 Tesla. Protons were obtained from originally negatively charged hydrogen ions and pre-accelerated to 50 MeV in a linear accelerator. They were then injected into the proton synchrotron DESY-III and accelerated further to 7 GeV. Then they were transferred to PETRA where they were accelerated to 40 GeV. Finally, they were injected into their storage ring in the HERA tunnel and reached their final energy of 920 GeV. The proton storage ring used superconducting magnets to keep the protons on track. The lepton beam in HERA became naturally transversely polarised through the Sokolov-Ternov effect. The characteristic build-up time expected for the HERA accelerator was approximately 40 minutes. Spin rotators on either side of the experiments changed the transverse polarisation of the beam into longitudinal polarisation. The positron beam polarisation was measured using two independent polarimeters, the transverse polarimeter (TPOL) and the longitudinal polarimeter (LPOL). Both devices exploit the spin-dependent cross section for Compton scattering of circularly polarised photons off positrons to measure the beam polarisation. The transverse polarimeter was upgraded in 2001 to provide a fast measurement for every positron bunch, and position-sensitive silicon strip and scintillating-fibre detectors were added to investigate systematic effects. On 30 June 2007 at 11:23 pm, HERA was shut down, and dismantling of the four experiments started. HERA's main pre-accelerator PETRA was converted into a synchrotron radiation source, operating under the name PETRA-III since August 2010.