place

Hambach Forest

AutonomismEnvironmental issues in GermanyForests and woodlands of North Rhine-WestphaliaImportant Bird Areas of GermanyNonviolent occupation
Old-growth forestsPages including recorded pronunciationsPages with German IPASquats in Germany
Cut forest digger in bkgrd
Cut forest digger in bkgrd

Hambach Forest (German: Hambacher Wald, Hambacher Forst (German pronunciation: [ˈhambaxɐ ˈfɔʁst] ), Bürgewald, Die Bürge) is an ancient forest located near Buir in North Rhine-Westphalia, western Germany, between Cologne and Aachen. It was planned to be cleared as part of the Hambach surface mine by owner RWE AG. There were protests and occupations from 2012 against this, and in 2020 a law was passed to preserve it.

Excerpt from the Wikipedia article Hambach Forest (License: CC BY-SA 3.0, Authors, Images).

Geographical coordinates (GPS)

Latitude Longitude
N 50.9074 ° E 6.4488 °
placeShow on map

Address


52382
North Rhine-Westphalia, Germany
mapOpen on Google Maps

Cut forest digger in bkgrd
Cut forest digger in bkgrd
Share experience

Nearby Places

AVR reactor
AVR reactor

The AVR reactor (German: Arbeitsgemeinschaft Versuchsreaktor) was a prototype pebble-bed reactor, located immediately adjacent to Jülich Research Centre in West Germany, constructed in 1960, grid connected in 1967 and shut down in 1988. It was a 15 MWe, 46 MWt test reactor used to develop and test a variety of fuels and machinery. The AVR was based on the concept of a "Daniels pile" by Farrington Daniels, the inventor of pebble bed reactors. Rudolf Schulten is commonly recognized as the intellectual father of the reactor. A consortium of 15 community electric companies owned and operated the plant. Over its lifetime the reactor had many accidents, earning it the name "shipwreck." From 2011 to 2014, outside experts examined the historical operations and operational hazards and described serious concealed problems and wrongdoings in their final 2014 report. For example, in 1978 operators bypassed reactor shutdown controls to delay an emergency shutdown during an accident for six days. In 2014 the JRC and AVR publicly admitted to failures. Its decommissioning has been exceptionally difficult, time-consuming and expensive. Since the original operators were overwhelmed by the effort, government agencies took over dismantling and disposal. In 2003 the reactor and its nuclear waste became government property. The temporary storage of 152 casks of spent fuel has been a controversy since 2009. The approval expired in 2013, because stress tests could not sufficiently demonstrate safety; no permanent solution has been reached. Since 2012 plans to export the casks to the United States have been considered due to the extremely high disposal expenses. In 2014, a massive concrete wall to protect against terrorist plane crashes was to be built. On July 2, 2014, the Federal Environment ministry issued an evacuation order for the temporary storage.AVR was the basis of the technology licensed to China to build HTR-10 and the HTR-PM, which became operational in 2021.

Forschungszentrum Jülich
Forschungszentrum Jülich

Forschungszentrum Jülich (FZJ) is a national research institution that pursues interdisciplinary research in the fields of energy, information, and bioeconomy. It operates a broad range of research infrastructures like supercomputers, an atmospheric simulation chamber, electron microscopes, a particle accelerator, cleanrooms for nanotechnology, among other things. Current research priorities include the structural change in the Rhineland lignite-mining region, hydrogen, and quantum technologies. As a member of the Helmholtz Association with roughly 6,800 employees in ten institutes and 80 subinstitutes, Jülich is one of the largest research institutions in Europe. Forschungszentrum Jülich’s headquarters are located between the cities of Aachen, Cologne, and Düsseldorf on the outskirts of the North Rhine-Westphalian town of Jülich. FZJ has 15 branch offices in Germany and abroad, including eight sites at European and international neutron and synchrotron radiation sources, two joint institutes with the University of Münster, Friedrich-Alexander Universität Erlangen-Nürnberg (FAU), and Helmholtz-Zentrum Berlin (HZB), and three offices of Project Management Jülich (PtJ) in the cities of Bonn, Rostock, and Berlin. Jülich cooperates closely with RWTH Aachen University within the Jülich Aachen Research Alliance (JARA).The institution was established on 11 December 1956 by the state of North Rhine-Westphalia as a registered association before it was renamed Nuclear Research Centre Jülich in 1967. In 1990, its name was changed to “Forschungszentrum Jülich GmbH”.