place

Sobha Realty (Dubai Metro)

Dubai Metro stations
Marina Metro Station
Marina Metro Station

Sobha Realty (Arabic: شوبا العقارية) is a rapid transit station on the Red Line of the Dubai Metro in Dubai. It opened on 30 April 2010 as Dubai Marina and part of the extension to Ibn Battuta.

Excerpt from the Wikipedia article Sobha Realty (Dubai Metro) (License: CC BY-SA 3.0, Authors, Images).

Sobha Realty (Dubai Metro)
Sheikh Zayed Road (north),

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Sobha Realty (Dubai Metro)Continue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 25.07995 ° E 55.14759 °
placeShow on map

Address

دبي مارينا

Sheikh Zayed Road (north)

Dubai, United Arab Emirates
mapOpen on Google Maps

Marina Metro Station
Marina Metro Station
Share experience

Nearby Places

Jumeirah Lake Towers
Jumeirah Lake Towers

The Jumeirah Lakes Towers (JLT) (Arabic: أبراج بحيرات الجميرا) is a large development in Dubai, United Arab Emirates which consists of 80 towers being constructed along the edges of three artificial lakes (Lake Almas West, Lake Almas East, JLT Lake) as well as the JLT Embankment of eight towers facing Jumeirah Islands. Initially JLT had four lakes (Lake Almas West, Lake Almas East, Lake Elucio, Lake Allure), in late 2012 developer (DMCC) announced that lake Elucio would be drained and 55,000 m2 (590,000 sq ft) park would be created instead. Subsequently, Lake Allure has been renamed to JLT Lake. The total area covered by the lakes, waterways and landscaping will be 730,000-square-metre (7,900,000 sq ft). The towers will range from having 35 floors to having 45, except for the centerpiece (Almas Tower), which is 66 floors. The tallest tower and the centerpiece of the entire complex is Almas Tower which is situated on its own island between Lake Almas West and Lake Almas East. The completion of Saba Tower in December 2006 marked the first tower to be completed in Jumeirah Lakes Towers. The majority of construction took place in 2008. By April 2011, over 80 percent of the towers in JLT was claimed to have been completed. As of June 2015 there were reported to still be 11 towers being either left undone due to the 2009 crisis or still undergoing construction in JLT. The most prominent of these are Wind Tower 1 and Wind Tower 2 that are part of Cluster B and right on Shk. Zayed Road - they are under construction since more than 12 years.