place

Bontnewydd railway station

Bontnewydd, GwyneddHeritage railway stations in GwyneddPages with no open date in Infobox stationRailway stations built for UK heritage railwaysUse British English from December 2016
Wales railway station stubsWelsh Highland Railway
Bontnewyddstationsept2015
Bontnewyddstationsept2015

Bontnewydd is an unstaffed halt on the narrow gauge Welsh Highland Railway. The halt was opened on 31 May 1999 on the petition of the villagers of Bontnewydd and is between Caernarfon and Dinas on the Lôn Eifion cycle route. It is a request stop with no station buildings and a single low platform. The train services are operated by the Festiniog Railway Company.

Excerpt from the Wikipedia article Bontnewydd railway station (License: CC BY-SA 3.0, Authors, Images).

Bontnewydd railway station
Lôn Eifion,

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Bontnewydd railway stationContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 53.11597 ° E -4.27478 °
placeShow on map

Address

Lôn Eifion

Lôn Eifion
LL54 5RG , Caernarfon
Wales, United Kingdom
mapOpen on Google Maps

Bontnewyddstationsept2015
Bontnewyddstationsept2015
Share experience

Nearby Places

Dinas railway station
Dinas railway station

Dinas is a station on the narrow gauge Welsh Highland Railway, which was built in 1877 as the North Wales Narrow Gauge Railways Moel Tryfan Undertaking to carry dressed slate for trans-shipment to the LNWR. Passenger services ceased on 26 September 1936 until which time Dinas had been a joint station, known as Dinas Junction with the LNWR and later the LMS. In 1951, British Railways closed their part of the station but the line through the station remained open until the line from Caernarvon to Afon Wen was closed in 1964. The trackbed was subsequently developed as the Lôn Eifion tourist cycle route. When the station was reopened on 11 October 1997, it was as the southern temporary terminus of the extended and soon to be restored Welsh Highland Railway from Caernarfon. Following reconstruction of the trackbed, the line was reopened on its original trackbed, in stages; on 7 August 2000 to Waunfawr; in 2003 to Rhyd Ddu; through the Aberglaslyn Pass to Beddgelert and Hafod-y-lyn in 2009; 26 May 2010 for Pont Croesor and finally on 4 January 2011 to Porthmadog. The official opening for the completed line was 20 April 2011. The train services are operated by the Festiniog Railway Company by its Welsh Highland Railway subsidiary. At Dinas, the new narrow gauge platforms are built on the site of the former standard gauge platforms. Two buildings survive from the North Wales Narrow Gauge Railways era, namely the former goods shed and the original station building which has been carefully restored. Dinas station yards house the Welsh Highland Railway offices, carriage sheds and locomotive depot as well as extensive civil engineering works and sidings.