place

Thermal Power Plant 27

Cogeneration power stations in RussiaEnergy infrastructure completed in 1992Energy infrastructure completed in 2007Mytishchinsky DistrictNatural gas-fired power stations in Russia
Power station stubsRussian building and structure stubs
ТЭЦ 27
ТЭЦ 27

Thermal Power Plant 27 Severnaya (Russian: ТЭЦ-27 «Северная») is a combined heat and power plant located in the village of Chelobityevo in Mytishchinsky District of Moscow Oblast, Russia. It is owned and operated by Mosenergo. It provides heat and power to Mytishchi, as well as to Northern and North-Eastern Administrative Okrugs of Moscow.The decision to build the power plant was taken in 1980s. However, due to opposition of the local population the construction was postponed. The first unit became operational in 1996 and the second unit in 1998. The third unit was added in 2007 and the fourth unit in 2008.

Excerpt from the Wikipedia article Thermal Power Plant 27 (License: CC BY-SA 3.0, Authors, Images).

Thermal Power Plant 27
Волковское шоссе,

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Thermal Power Plant 27Continue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 55.916111111111 ° E 37.687777777778 °
placeShow on map

Address

Волковское шоссе
114021 , Ядреево
Moscow Oblast, Russia
mapOpen on Google Maps

ТЭЦ 27
ТЭЦ 27
Share experience

Nearby Places