place

Hastings City Hall

Buildings and structures in Hastings, MinnesotaCity and town halls in MinnesotaCity and town halls on the National Register of Historic Places in MinnesotaCounty courthouses in MinnesotaCourthouses on the National Register of Historic Places in Minnesota
Former courthouses in MinnesotaGovernment buildings completed in 1871Italianate architecture in MinnesotaNational Register of Historic Places in Dakota County, Minnesota
Hastings City Hall SE
Hastings City Hall SE

Hastings City Hall, formerly the Dakota County Courthouse, is a historic government building in Hastings, Minnesota, United States, completed in 1871. It was the original courthouse for Dakota County and now serves as city hall. It was designed by A.M. Radcliff, one of Minnesota's first architects, in an Italian Villa style. Although an addition built in 1955 in an entirely different style damaged the building's integrity, the building remains a prominent structure in downtown Hastings. The courthouse served as the seat of Dakota County government from 1871 until September 1974, when the county commissioners held their last meeting in the building. It became the Hastings City Hall in 1993.

Excerpt from the Wikipedia article Hastings City Hall (License: CC BY-SA 3.0, Authors, Images).

Hastings City Hall
Vermillion Street,

Geographical coordinates (GPS) Address External links Nearby Places
placeShow on map

Wikipedia: Hastings City HallContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 44.742694444444 ° E -92.851861111111 °
placeShow on map

Address

Hastings City Hall

Vermillion Street
55033
Minnesota, United States
mapOpen on Google Maps

linkWikiData (Q5210000)
linkOpenStreetMap (276659695)

Hastings City Hall SE
Hastings City Hall SE
Share experience

Nearby Places

Hastings Bridge
Hastings Bridge

The Hastings Bridge is a free standing tied-arch bridge that spans the Mississippi River in Hastings, Minnesota, United States. It was designed by Parsons and was built in 2013 by Lunda Construction Company for $119,830,000. The Hastings Bridge replaces the former Hastings High Bridge, which was built in 1951 and demolished in 2013 when the replacement bridge was completed. The Hastings High Bridge had been scheduled to be torn down and replaced in 2019, but after the I-35W bridge collapse in Minneapolis, the MNDOT re-prioritized the replacement and construction of the new bridge started in 2010. Following the August 1, 2007 collapse of the I-35W Mississippi River bridge, the Hastings High Bridge was inspected between August 20 and August 31, 2007. An executive summary of the inspection report was released on January 15, 2008, questioning whether the bridge was capable of sustaining its 40-ton posted capacity, and calling for a load analysis to be performed immediately. Because the existing bridge was obsolete and average daily traffic exceeded 30,000 vehicles, MNDOT accelerated the new bridge project to begin in 2010. Three design-build teams submitted proposals on June 30, 2010, and the contract was awarded to the joint venture Lunda/Ames. In June 2013, two of the four lanes of the new bridge were open for traffic, and in November 2013 all four lanes opened. The new bridge cost $130 million and is the longest free-standing tied-arch bridge in North America, at a length of 545 feet. The main span is composed of arches, girders, beams, stringers, and roadway, offering four lanes of traffic plus twelve feet of mixed use pedestrian and bike path. The new bridge has an anti-icing system. Other features include: a public art mural on the south abutment wall, a scenic overlook incorporated near Levee Park, additional parking beneath the bridge, and lighting. The new bridge is expected to have a 100-year lifespan.