place

Nożyk Synagogue

1902 establishments in PolandAC with 0 elementsNeoclassical architecture in PolandOrthodox synagogues in PolandRenaissance Revival synagogues
Synagogues completed in 1902Synagogues in WarsawŚródmieście, Warsaw
Synagoga Nożyków w Warszawie 2020
Synagoga Nożyków w Warszawie 2020

The Nożyk Synagogue (Polish: Synagoga Nożyków) is the only surviving prewar Jewish house of prayer in Warsaw, Poland. It was built in 1898-1902 and was restored after World War II. It is still operational and currently houses the Warsaw Jewish Commune, as well as other Jewish organizations.

Excerpt from the Wikipedia article Nożyk Synagogue (License: CC BY-SA 3.0, Authors, Images).

Nożyk Synagogue
Twarda, Warsaw Śródmieście (Warsaw)

Geographical coordinates (GPS) Address External links Nearby Places
placeShow on map

Wikipedia: Nożyk SynagogueContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 52.236111111111 ° E 21.001111111111 °
placeShow on map

Address

Synagoga Nożyków (Synagoga im. Rywki i Zalmana Nożyków)

Twarda 6
00-950 Warsaw, Śródmieście (Warsaw)
Masovian Voivodeship, Poland
mapOpen on Google Maps

linkWikiData (Q2915221)
linkOpenStreetMap (32792753)

Synagoga Nożyków w Warszawie 2020
Synagoga Nożyków w Warszawie 2020
Share experience

Nearby Places

Spektrum Tower
Spektrum Tower

The Spektrum Tower (formerly TP S.A. Tower) is a highrise office tower in Warsaw, the capital of Poland. It is located at 14/16 Twarda Street in the Warszawa-Śródmieście central business district of the city and used to house the headquarters of its investor, the telecom operator Telekomunikacja Polska S.A. (TP S.A.), with some space being leased to other companies. The building of the tower was initially contracted to PIA Piasecki S.A. on 1 August 1997, originally due to be completed 30 June 2002. In 2002, however, the contractor was found unable to complete the structure due to strained financial standing, and the investor turned to PORR Polska S.A. (who has completed a number of other office buildings and towers in Warsaw) to finish the construction. The Tower was finally completed in December 2003. The Tower was built using the "top-down" technology, with both the over- and underground parts of the structure being constructed simultaneously. During the excavation for the foundation of the Tower, a 580 kg artillery shell from World War II was discovered 8 metres below ground level. The Tower was designed by architects from Apar-Projekt and Arca A&C bureaus, and consists of a composition of cylinders and cuboids. The structural design was the responsibility of TMJ Tomasz Ziętała. The Tower has 30 overground and 5 underground floors, extending 16.5 metres below ground level and rising to 128 metres above ground. The building comprises almost 50,000 m2 of space, over 41,000 of which is usable. Unique features of the building include the helipad on the roof and the external elevator shaft, sloped 14°, which connects the street level with one of the higher office floors with an elevator cabin travelling at 2.5 m/s. Apart from it, there are seven other straight-up elevator shafts in the building core. The Tower is a modern intelligent building, fitted with building automation systems. In July 2008 it was sold to Danish investment fund Baltic Property Trust Optima which sold it in 2012 to a London-based Europa Capital LLP fund