place

Washington County Courthouse (Nebraska)

1891 establishments in NebraskaCounty courthouses in NebraskaCourthouses on the National Register of Historic Places in NebraskaGovernment buildings completed in 1891National Register of Historic Places in Washington County, Nebraska
Nebraska Registered Historic Place stubsRenaissance Revival architecture in NebraskaUse mdy dates from August 2023
Washington County, Nebraska courthouse from SE
Washington County, Nebraska courthouse from SE

The Washington County Courthouse in Blair, Nebraska was built during 1889–91. It was listed on the National Register of Historic Places in 1990.It was designed by Lincoln, Nebraska, architect O.H. Placey. It has four corner towers and a central dome. Its north and west pediments include metal sculpture.An unusual feature is the pedimental sculpture in two pediments, consisting of painted metal forms. These include symbolism of "cornucopia, wheat, pumpkins [which] call attention to the fertile agricultural foundation of the county, while the ship in full sail likely recalls the immigrant experience and the shields symbolize county government."

Excerpt from the Wikipedia article Washington County Courthouse (Nebraska) (License: CC BY-SA 3.0, Authors, Images).

Washington County Courthouse (Nebraska)
Colfax Street,

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Washington County Courthouse (Nebraska)Continue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 41.54 ° E -96.135 °
placeShow on map

Address

Washington County Sheriffs Office

Colfax Street
68008
Nebraska, United States
mapOpen on Google Maps

Washington County, Nebraska courthouse from SE
Washington County, Nebraska courthouse from SE
Share experience

Nearby Places

Fort Calhoun Nuclear Generating Station
Fort Calhoun Nuclear Generating Station

The Fort Calhoun Nuclear Generating Station is a shut-down nuclear power plant located on 660 acres (2.7 km2) between Fort Calhoun, and Blair, Nebraska adjacent to the Missouri River between mile markers 645.6 and 646.0. The utility has an easement for another 580 acres (2.3 km2) which is maintained in a natural state. The power plant is owned by the Omaha Public Power District of Omaha, Nebraska. When operational, the plant accounted for 25 percent of OPPD's net generation capabilities.The plant's single Combustion Engineering pressurized water reactor generated 484 megawatts of electricity. This was the smallest rated capacity among all operating commercial power reactors in North America, and as a single-unit plant, this also qualified it as the smallest rated capacity nuclear power plant. OPPD's two Nebraska City coal-fired plants at 682 (opened 2009) and 649 (opened 1979) MW are both significantly larger.Fort Calhoun houses spent fuel rods in a 40-foot (12 m) deep spent fuel pool next to the reactor, and when the pool had nearly reached capacity in 2006, OPPD began to store spent fuel rods above ground in dry cask storage as well. In total, the Ft. Calhoun reactor has 600,000 to 800,000 pounds (270,000 to 360,000 kg) of high level nuclear waste. The storage was not designed to house spent fuel permanently, but when plans for Yucca Mountain nuclear waste repository were terminated, OPPD stated that they are "prepared to safely store material on-site as long as necessary".The plant underwent refurbishment in 2006 by having its steam generators, pressurizer, reactor vessel head, low pressure turbines and main transformer replaced. In 2003, the plant had its operating license renewed for an additional twenty years. With the renewal, the license for Fort Calhoun was extended from August 9, 2013, to August 9, 2033.The 2011 Missouri River floods surrounded the plant with flood water. The nuclear reactor had been shut down and defueled in April 2011 for scheduled refueling. A fire caused electricity to shut off in the spent fuel pools resulting in 90 minutes without cooling qualifying as a "red event", signifying a high-level threat to Fort Calhoun operations. The flood and resulting fire was called "one of the most serious safety incidents in recent years" and resulted in a three-year cold shut-down of the plant.In August 2012 OPPD signed a deal for Exelon Nuclear Partners to manage the plant although OPPD would maintain ownership. In February 2017, OPPD ended the service contract with Exelon by paying a $5 million fee, but will also be subject to "wind-down" fees.The plant was shut down on October 24, 2016.