place

Stade du Tivoli

Belgian sports venue stubsFootball venues in WalloniaLa LouvièreMulti-purpose stadiums in BelgiumSport in La Louvière
Sports venues in Hainaut (province)
Stade communal de Tivoli
Stade communal de Tivoli

The Stade Communal du Tivoli is a multi-use stadium in La Louvière, Belgium. It is currently used mostly for football matches. It was the home ground of R.A.A. Louviéroise. The stadium holds 12,500 people and was built in 1972. UR La Louvière Centre are its current tenants.

Excerpt from the Wikipedia article Stade du Tivoli (License: CC BY-SA 3.0, Authors, Images).

Stade du Tivoli
Rue des Croix du Feu, La Louvière

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Stade du TivoliContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 50.478278 ° E 4.201026 °
placeShow on map

Address

Rue des Croix du Feu
7100 La Louvière
Hainaut, Belgium
mapOpen on Google Maps

Stade communal de Tivoli
Stade communal de Tivoli
Share experience

Nearby Places

Triage-Lavoir de Péronnes
Triage-Lavoir de Péronnes

Triage-Lavoir de Péronnes is a former coal washing facility that was built with the help of the Marshall Plan in 1954. It was built for the demand of the coal industry to process the coal coming from the mines of Péronnes, Ressaix and Trivières. It was capable processing over 3,000 tons of coal daily. In 1969 the nearby coal mines in Saint-Albert and Sint-Margriete were closed, which caused Triage-Lavoir to become useless, and it was closed down after only 15 years of active operation. Immediately after closing the facility, all the machines and equipment were removed and the facility stayed abandoned for over 3 decades. The building was under threat of demolition in 2000 but on May 15, 2003, it was classified as a monument to be saved. Currently the building is under renovation financed by the European Union and the Walloon Region through the Marshall Plan of Wallonia program. The renovation started in September 2005. The renovation of the exterior of the building was scheduled to be finished by September 2006. The budget for the walls was 2.1 million euros. In spring 2010, the renovation work was still in progress. The exterior and a small fraction of the ground floor has been rebuilt. Certain parts of the old building will be left untouched, other than cleaning and careful restoring, in order to preserve the building's unique architectural elements. Inside the back of the building, half buried in the ground, new storage rooms will be built for the companies to use.The renovated building is supposed host several organisations, including The General Archives of the Royalty (intermediate centre of archives), Royal Institute of Natural Sciences of Belgium (stores coal and fossil core-samples), the IFAPME (center of professional development: contemporary artwork, design) and some private offices.