place

Amaranth Wind Farm

Buildings and structures in Dufferin CountyWind farms in Ontario
Melancthon ON 2
Melancthon ON 2

The Amaranth Wind Farm, also known as the Melancthon EcoPower Centre, is a 199.5 megawatt (MW) wind farm in Amaranth and Melancthon Township, near Shelburne, Ontario. The centre is owned and operated by TransAlta and at the time of opening, was Canada's largest wind energy installation.Construction of the Melancthon EcoPower Centre began with the 67.5 MW Phase I in 2005 and achieved commercial operation in March 2006. Construction of the 132 MW Phase II of the project began in 2007 and achieved full commercial operation in November 2008.

Excerpt from the Wikipedia article Amaranth Wind Farm (License: CC BY-SA 3.0, Authors, Images).

Amaranth Wind Farm
County Road 17, Melancthon

Geographical coordinates (GPS) Address
placeShow on map

Wikipedia: Amaranth Wind FarmContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 44.1001 ° E -80.2709 °
placeShow on map

Address

County Road 17 582354
Melancthon
Ontario, Canada
mapOpen on Google Maps

Melancthon ON 2
Melancthon ON 2
Share experience